Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1 set/month
Option:
Technical Data
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Hoisting: Mechanism

Product Description:

Profile 

As a kind of special-purpose lifting equipment, shipbuilding gantry crane is used at dockyard or slipway of ship build yard. Shipbuilding gate cranes are sometimes called Goliath crane in English. Goliath is the name of the giant in Bible. Latter, it is referred to mobile giant crane. What is the characteristic is that it has a larger span, higher height. Generally, the span of shipbuilding gantry crane can reach more than 40 m and the max. span of the shipbuilding gantry crane can reach 200 m. The height under the main girder can reach 40-80 m. Because it has a large span, one side of the portal adopts rigid supporting leg and the other side adopts flexible supporting leg. in other words, the side which adopts rigid supporting leg joints with the main girder solidly. And, the other side which adopts flexible supporting legs joints with the main girder by flexible hinge. In accordance with the requirement of shipbuilding technology, the shipbuilding gantry crane has following functions, such as handling the materials with single hook, handling the materials with double hooks, handling the materials with three hooks, turning over the body section in the sky, small volume angle spinning and other multiple functions. Especially, it can satisfy the requirement of turning over and gathering up of body section. In order to complete the described function, generally, the shipbuilding gantry crane is carried with up and down two trolleys.

And, the up and down two trolleys will run in separate railway. On the up trolley, it mounts two lifting mechanism, which has the same lifting capacity. The suspension centre of the lifting mechanism locates on outside of the main girder separately. The two lifting mechanism can be operated for its separated purpose or the two lifting mechanism can be operated together to handle the materials, which can complete the spinning of the body section and the hoisting of the body section. Both hooks mounts transverse mechanism, which can complete the horizontal movement separately. Generally speaking, the distance of horizontal movement can reach 1.5 m or 2 m. Thus, it can realize the fine adjustment and fine spinning. It can be accurate when the body section is closed. The under trolley equips with main hook and auxiliary hook. The two hooks is set in the middle of position of the main girder. The main hook can individually lift the body of the ship. Also, it can complete the lifting operation with three hooks combining with the hook of the up trolley. Generally, the lifting capacity of auxiliary hook of the trolley is small, but the lifting speed of the auxiliary is quick. It can lift some small components. In according with the coordination action among the two hooks of the up and down trolley, the main hook of the down trolley and the traveling mechanism of the up and down trolley, it can realize the turning over of the body of the shipbuilding gantry crane in the air.

Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane

Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane

Sketch

 

Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane


Technical specification

Lifting capacity (t)

t

2*50+100

2*75+100

2*100+160

2+150+200

2*400+400

Two trolley lifting

1150

200

300

500

1000

Section reverse painting

100

150

200

300

800

Working system


A5

Span

M

50

70

70

175

185

Lifting height

H1

35

50

50

65/10

76/13

H2

35

50

50

65/10

76/13

Up and down trolley

Hoisting speed

m/min

0.5~5(full load)

0.5~5(full load)

0.4~4(full load)

0.5~5(full load)

0.32~3.2(dull load)

1~10(underloading)

1~10(underloading)

0.8~8(underloading)

1~10(underloading)

0.64~6.4(underloading)

Traveling speed

2.5~25(full load)

2~20(full load)

3~30(full load)

1~25(full load)

3~30(full load)

3.5~35(empty load)

3~30(empty load)

4.5~45(empty load)

1~30(empty load)

3~40(empty load)

Crane traveling speed

2.5~25(full load)

2.5~25(full load)

3~30(full load)

1~25(full load)

3~30(full load)

2.5~35(empty load)

2.5~35(empty load)

3~45(empty load)

1~30(empty load)

3~40(empty load)

Max. Wheel load

KN

260

320

330

700

750

Total power

KW

400

530

650

1550

1500

Power source

Three phase AC 50Hz 10K

Main technical parameter

It has following advantages, such as, lifting the body of the ship with single hook, hoisting, turning over the body of the ship in the air, horizontal slight spinning in the air

The portal has two type, double girder and single girder, which can be chose by user. In order to make use of the materials reasonably, the main girder adopts variable cross-section optimal design.

The rigid supporting leg of the portal has two types, single column type and double column type, which can be chose by user.

The up trolley sets with double main hooks, which is set on both sides of the main girder, but it can realize individual horizontal movement or move the two hooks at the same time, 0~2m.

The down trolley sets two hooks, main hook and auxiliary hook, which is mounted under the centre of the girder.

The up and down trolley can realize mutual cross operation

All the lifting mechanisms and traveling mechanism adopt frequency control.

On the side of the rigid supporting legs and on the top surface of the main girder is mounted tumbler crane for maintaining, which aims to maintain the up and down trolley.

The elevator is mounted on the inner side of the rigid supporting leg, which aims to make it convenient to get on the shipbuilding gantry crane. 

Packaging & Shipping

 Delivery  Packaging:

1. Electric parts and hoists are packed by high quality plywood crate to cut and avoid loss caused by shake and collision during sea transportation.

2. Girders are packed by strong plastic woven cloth to protect them from rusting in the harsh environment of high humidity.

Delivery:

1. All equipments are transported to ports by truck.

2. Equipments are transported to the destination port by container ship or bulk ship according to the size and your demand.

Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane

Shipbuilding Gantry Crane,Anti-Sway, Assembling Body,Gantry Crane

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:the answer is in the parenthesis i just need to know how to work it outA crane lifts a 48 kg load at a speed of 1.4 m/sHow much power was delivered? (659 W)
Power work/time Fd /t Fv (mg)(v) (48)(9.8)(1.4) 660 W
Q:Building a 4,000 square foot house
Prestressed concrete means the beams and panels are poured in place elsewhere with the reinforcement tensioned during the pouringThus the cost depends on the size of the beams and how far they have to be transportedThis is normally only done with commercial buildings and bridgesIf you are going to do it in a house, the beams have to be professionally designed You would get an estimate from the maker Concrete poured in place on your property is normally done with rebar that is not tensionedAll the framing needs to be built to support the weight of the concrete if you are doing floors and ceilings Unless there is an overwhelming reason for a concrete reinforced beam roof (like parking on the roof or design), it would be very unlikely that even an all concrete house would have a heavy roof - steel beams or trusses and builtup roofing are much more likelyAnd less expensive.
Q:I am doing some research and am looking for something besides a crane or salmonI have found mention of the tree of life and a cauldronI'm not sure if there is anymore does any one have anything else?
Triskelion: A Greek term meaning three-legged, and thus this sign looks very much like three legs runningThe Celtic symbol meaning here is appropriate because this symbol stands for competition and man's progressFor more details on the Celtic symbol meanings of the Triskelion, click here Triquetra: Latin meaning three-corneredIt's a holy symbol, and it's meanings are manyIt varies in its aspects of spirit, nature, being-ness, and of the cosmosFor the full meaning of the Celtic triquetra symbol, click here Triple Spiral: Represents the drawing of the three powers of maiden, mother and croneIt is a sign of female power and especially power through transition and growthSee more about the symbolism of spirals here Three Rays (Arwen): The first and third rays in this symbol represent male and female energy (respectively)The middle ray represents the balance of both energiesSee also Yin-Yang symbols pageSee also fire symbol (Arwen is the 3rd symbol down) Single Spiral: Represents ethereal energy radiating out (or inward depending on your perspective) Also symbolizes growth, birth and expansion of consciousnessI've devoted an entire page on the symbolic meaning of spiral here (blog) Five-fold: This pattern also represents balanceThe four outer circles symbolize the four elements: earth, fire, water, airThe middle circle unites all the elements with a goal to reach balance between all four elements or energiesSee this page for more Celtic meanings for the five-fold symbol Threefold: See Triple spiralThe center of this symbol represents the hub signifying unity of the three powersMore on the Celtic symbolism of threefold symbols can be found here Double Spiral: A sign of balance and also representative of the equinoxes Crosses: Represent the bridge or the passage between heaven and earthThe circle in the ringed cross signifies infinity and eternal spiritual lovesee more on Celtic cross meaning here.
Q:one of the networks is the building network and one is a local network for a video production labAnd there is one system that is able to be on both networks, and we don't want to keep switching cables each time we need to get files off of the video network, on to that systemWe don't have a lot of money to spend on buying a proudct, so building something is prefered.
Q:I'm trying to come up with a catchy name for a project at my jobSo when I say construction what are 2-3 words that come to mind?
You can buy silver polish at Walmart, grocery store, possibly a dollar store, even CVS or Eckard might carry it in the household section.
Q:I want to know what scenes each of these songs were used forThe list of songs and artists can be found on googleIf you could tell me where each one was used like what scene they were in that would be greatEven if you know one of the sons please post it.
Q:I need to know within the next 40 minutes I check Wikipedia and either don't understand it, Can't find it or just I dunno.So I need to know quot;Why do we use leversquot;
We use leavers in robotics ( technology) it helps cranes lift things like heavy woodWe use leavers because it helps people lift wht they can't
Q:My husband and I have rcently thought about building a new home, because ours doesn't suit our needsWe don't want to sell ours and buy another one because the location of our property, and when we bought it, we got a really good dealWe have 2.8 acres, and it is all pretty much flat lawn spaceWe love where it is at, but the layout of the house is horrible, and there is really no way to build onto itIt just isn't laid out to do any add-onsHe said something about a home building kitI am not sure what he is talking aboutHe said when you order it, the home comes in pieces, and you pretty much anchor it and put it togetherAnyone have any ideas on what he is talking about, and where I can find more information? Thanks!!
He could be talking about a SIP wall home (structurally insulated panels-1/2 inch OSB on both sides with foam material in the center)The home comes out in pieces, each with electical/plumbing chases already in the wall at regular intervalsThey are well insulated and generally erected with a crane or skytrack (lift truck with extending boom)Or a more complete, modular style home where the pieces are larger and more complet, placed together like puzzle pieces for a quicker finished productThe layout in each is only restricted by your imagination and your pocketbook.
Q:I have to plan the site for reconstructing the crossroad shown in the imageI have to locate the steel layout area, site offices, tower cranes places and the access roadsWhat do u recommendthanks in advance
Baking paper sticks.You need foil or oil spread on the surface.
Q:from the last times we played, the season before last?How about Frank Lampard's classy chip over Valdez?
Naval Jelly Aluminum

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
Hot Searches
客服
live chat