SERIE OTR160D OTR HYDRAULIC PILING RIG MACHINE
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
OTR160D:
①. Base: CAT 329D(HHP)
②. Max pile diameter (mm): 1800
③. Max pile depth (m): 60
④. Engine: CAT C7 ACERT 187KW
⑤. Maximum nominal torque (kNm): 200
⑥. Undercarriage with expandable (mm): 3000-4300
……More info
1. Adopts the complete OEM Caterpillar retractable-crawler dedicated chasis,Its telescopic scope between the two crawler ends extends from 3000mm(at transportation) to 4400mm(at work). Undercarriage with expandable and removable tracks by means of hydraulic cylinders, guarantee exception stabbility in any type of ground. It has considerable traction force which allows easy movement even in the most difficult job sites.
2.Takes international top CAT Diesel engine with electric injection, turbocharged and air inter-cooling system. It is high reliability, fuel economy and power reserves. Emissions meet standard EPAC-Ⅲ.
3.The winches are positioned in the lower part of the mast, in front of the cabin, so that the operator can constantly check the proper operation. Thanks to the fact that the cable moves parallely to the mast, flection is not created on the upper part of the mast and operating life of the cable is therefore much longer. Tail positioned winch is available for heavy-duty type.
4.New design parallelogram system, computer optimized design and simplified pin connection system featured with nice appearance, great driving force and good stability, especially shaped to fit crowd system, allowing working radius adjustment always maintaining the mast in vertical position. The parallelogram system is easily for convenient transform between transportation and working conditions.
5.Self-erecting mast, high level anti-shock technology and high-strenth material steel attribute to that max torque can be applied all over the mast length. Multipurpose design for cylinder crowed system. Sensor and control center realize real-time measurement of the inclination angle, auto adjustment of mast verticality and inching adjustment.
6.Crowd system by means of long stroke hydraulic cylinder or crowd winch separately, are option for your exact request.
7.Rotary head with variable displacement motors and one high spin off speed. And rotary is extremely reliable, it has been disgned in order to gurantee a very compact, efficient and powerful rotary. The transmission group of rotary is made up of a hydraulic motor and new power shift purposely studied and designed to obtain maximum perfomance. During the drilling phase, the rotary has the entire power of the diesel at its complete disposal. Adapter of rotary is essential to absorb the considerable shock connected to the high speed of the main winch.
8.Telescopic kelly bar with guide made by high quality specially for high boring strength and torque force. Available with friction or inter-locking type.
9. All the main hydraulic components(pumps, valve, motor, connector) are from well-known international brands such as Bosch-Rexroth, brevini, which ensure the stability, reliability, high-efficiency and energy-saving of the entire system
10.Electronic controlling system is an innovative system, developed by Osaint, which controls and monitors the operation of the machines. For ease of operation, the system is controlled by a touch screen located in the cab. The system function is to enable the machines to perform different functions more efficiently. A dedicated power module electronic control and CAN-Bus system ensures the main pumps and Disel engine to work at their most effective and productive stages.
- Q: Rotary drilling rig application
- The purpose of rotary drilling rig is cast-in-place bored pile drilling (Cheng Kong).
- Q: What material steel pipe do the drill pipe use?
- Commonly used materials for geological drill pipe are DZ40, DZ50, DZ60, R780 and other geological drilling seamless steel pipe. Seamless steel pipe for drilling pipe, which is used for petroleum drilling pipe in petroleum industry. General parameters of seamless steel pipe for drilling rod.
- Q: XCMG XR360 rotary drilling rig generally how much?
- 5 million 700 thousand standard 508 drill pipe, section five 77 or four Mimo resistance pipe, section 62 meters machine lock, two optional one
- Q: What are the reasons for partial drilling of rotary drilling machine?
- Geology: partial hole geology is the main reason, if the geological are loess layer, clay layer, so the hole will not appear error phenomenon, mostly by the geological changes, weathered rock, rock distribution and the drilling bucket uneven stress and the formation of.
- Q: How many litres of oil are usually consumed per hour in a rotary drilling rig?
- This is not sure, depends on what type, and when the work is not full power work. +1And you work with the stratum is related, as far as I know, the intelligent drilling machine is still more fuel-efficient, 31, Zhonglian is also good
- Q: What brand of rotary drilling rig quality is better? How much? How long is it back?
- Rotary drilling rig is still a gap between domestic brands and foreign brands.
- Q: I love inventing super rotary drilling rigs. Can they dig wells? Can they move rocks? How deep can they hit?
- Because now the double power head drill wells with rotary drill rod is rotary drill, but few are more than 2 meters in diameter with direct rock itself, very fast, low cost of the machine drill many times than rotary drilling. I suggest you check the pile hole drill on the Internet, or the China Sea Hengtong, it is easy to find information.
- Q: How to ensure the verticality of rotary drilling rig
- What time should I pay attention to?:1, drill mast verticality should be controlled within 0.2 degrees.2. The gap between the power head and the drill mast must not be too large.3. The center of the follow-up frame of the drill rod shall be in accordance with the center of the power head.4, not square drill pipe and drill pipe deflection.5, the lower protective cylinder should be vertical.6, bit square box and the central cone cannot skew.7, for the big changes in the bottom, it is recommended to use straight cylindrical bit.
- Q: 200 rig footage every day how many meters
- Footage number and geological conditions, drilling performance, operator proficiency, construction site conditions have a relationship, and to say that footage of the day, and the length of pile pile diameter has a diameter of 1.2 meters, with 60 meters long, 2 meters under the casing 0.5 hours, casing well Party A, the Commissioner General to look at. General situation, the first 20 meters of drilling, probably within 1 hours, 20-40 meters, less than 1.5 hours, 40-60 meters, less than 2 hours.
- Q: How can the drill pipe cracking of rotary drilling rig be welded?
- Tell you, you remember, it's a friction welded joint! If it is not friction welding, it is deceptive. Because the oil drill pipe is friction welded. There is a welding and cutting equipment company in Harbin. I used to work as a technician there. Can help you with this problem.
Send your message to us
SERIE OTR160D OTR HYDRAULIC PILING RIG MACHINE
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords