• Scafold Gray Flame Heavy Duty Adjustable Caster System 1
Scafold Gray Flame Heavy Duty Adjustable Caster

Scafold Gray Flame Heavy Duty Adjustable Caster

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1.Shock absorption
2.Acid, oil resistant
3.Wear-resistant
4.Large load capacity
5.More durable

 

Product Description

1.Double ball bearing caster wheel 007 series.

2.Large load capacity can make sure the goods not easy to topple over, can move steadly.

3.It is widely used on moveable equipments,business,logistics and transportation etc.

Model No.Diameter(mm)Tread Width(mm)MaterialLoad Capacity(kg)BearingLoad Height(mm)Top Plate Size(mm)Hole Spacing(mm)Hole Size(mm)
007-4"10050PU/PVC250Cylindrical Roller143115*10084*7220*11
007-5"12550PU/PVC270Cylindrical Roller164115*10084*7220*11
007-6"15050PU/PVC300Cylindrical Roller190115*10084*7220*11
007-8"20050PU/PVC340Cylindrical Roller242115*10084*7220*11

 

Q: Latch type disc scaffolding accessories are national patent products?
Disk lock scaffolding called socket type Pankou scaffold.Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q: i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
It recommends tea tree oil, or vitamin E oil applied directly to the area.
Q: What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q: Specification for construction steel pipe scaffolding and construction safety rules?
Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.
Q: For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
The scaffold is outside the frame, it is characterized by relatively large height, shape, wind load and gravity load is; while the template bracket shape because the concrete component varies, the total height, gravity load, improper placement to lose stability, no need to calculate the wind load, etc..
Q: How to maintain the scaffold after use
To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Double pole scaffolding and scaffold for decoration of the vertical distance rod step distance should be less than or equal to 2.0m. peaceFrom the operation layer (floor) scaffold surface height is over 2.0m, the width of working layer deck should not be less than: scaffold for 750mm in scaffolding for the clearance of 500mm. edge of the plank and wall should be more than 300 mm, and blocking foot clearance should be more than 100mm. when the side board is not close to the pole, should with reliable fixation.
Q: What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q: Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords