Precision Casting Cast Steel Black Scaffold adapting piece

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month
Inquire Now Customer Service
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Quick Details

Brand Name:


Model Number:

HY060111



Type:

Scaffolding Parts

Scaffolding Part Type:

Scaffolding Couplers

Material:

cast steel

Color:

as your demands

Weight:

0.2kg-2kg

Technic:

precision casting

Application:

scaffold

Roughness:

Ra6.3-Ra25

Treatment:

sand blast

Dimensions:

as your drawings





Packaging & Delivery

Packaging Detail:wooden cases or as demands
Delivery Detail:within 20-30 days after deposit

Specifications

Precision Casting Cast Steel Black Scaffold adapting piece 
Material:cast steeel 
Technic:precision casting 
Prompt delivery

OEM cast steel scaffold adapting piece

 

 

1.Material:cast steeel
2.Technic:precision casting
3.Prompt delivery
4.Top quality

 

 

Company introduction:

 

1. Our company has advanced technological equipment, all kinds of quality checking equipment.

2. Now a series of strict quality control and manufacture process have been established.

3. Our quality management system is in conformance with ISO9001:2000

4. We have accumulated plenty experience and our company has been expanding by leaps and bounds.

 

Inspection:

 

1. First of all the whole quality control management has been carried out during the entire process of manufacture with the assistance of computer and other numerical control equipment, which includes the raw material, production process control, final product quality control.

2. Third party inspection available upon requirement.

 

Our many Main Export Market:

 

1. There are more than 50 customers all over the world.

2. Exported to U.S.A, U.K, Germany, Italy, Japan, Swiss, Australia, Korea, and South-east Asia. All of products are manufactured in accordance with the U.S, Japan and Germany standards.


Q:..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
Mostly the person would be taken onto the scaffold , a rope fixed around their neck, and then the trap door would open and they would drop through and choke to death , very rarely did the neck break in those days , so relatives and friends would pull on the legs , thus to speed up death. Earlier in history people were strung up from trees , and sometimes stood in the back of a cart which was driven away leaving them dangling. The platform on which the guillotine was stood was also called a scaffold at times. These executions were turned into social events and hundreds of people used to go to look.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Who has external scaffolding construction program
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
Q:i have lived in york for ten years and have been told many times that the minster in york has had scaffolding up for decades and that it has to stay there for political or religious reason there is never any work done or indeed workers on the scaffolding. can anyone shed any light on the matter for me or is it just an urban myth and nothing more than on going restoration.
York Minster Scaffolding
Q:Can you do the outer scaffolding?
6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Im thinking of getting a scaffold piercing when i am old enough to and ive seen videos of people who have one but it cause bacteria in their ear and if they take it out their ears swell. I want to know if this is a bad piercing to get. Also i have had an allergic reaction to an earring before and im not sure what type of earring it was. Can that affect it as well.
It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

- Self introduction

- Required specifications

- Inquire about price/MOQ

This is not what you are looking for? Post Buying Request
wechat