scaffolding formwork board coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:Jiangsu China


Model Number:
scaffold board retaining coupler
Type:
scaffolding coupler
Material:
Q235/225/345
Surface:
Paint,Galvanized,HDG
Color:
silver,yellow,black or as your request
Size:
48.3mm
Weight:
0.65kg
Technics:
Forged
Standard:
EN74, BS1139
scaffolding coupler:
scaffold board retaining coupler
Stable:
durable

Packaging & Delivery

Packaging Detail:in bulk or pallet according to customer's requirement scaffold board retaining coupler
Delivery Detail:no more than 15days

Specifications

Best price Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport.
board retaining coupler

Scaffolding coupler

1.Experienced

2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank

Specification

Scaffolding board retaining coupler

1.size:48.3mm

2.weight:0.65kg

3.Material: Q235/225/345

4.surface :self-color / zinc plate / electro galvanized / HDG or painted

5.Standard: EN74 ,BS1139

6.Anti-rust ,skidproof ,high breaking strength

7.Durable finish, reliability, low maintenance, corrosion resistance, robust construction and high tensile strength

8. OEM serice is available

Product pictures show


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:why are there lumps on my scaffold peircing :S?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
5, Pankou scaffold disassembly do very simple, a person needs only a hammer can do the installation and removal of the entire process. Construction efficiency greatly improved, two construction workers only 1 days to complete the construction site 350m3.
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:As Hester once did, what time of day did Dimmesdale attend the Scaffold, and what compels his action?
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:How to maintain the scaffold after use
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:Please help me in building professional people (scaffolding)
Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range