• Scaffold Steel Plank Scaffold for Outdoor Building System 1
  • Scaffold Steel Plank Scaffold for Outdoor Building System 2
Scaffold Steel Plank Scaffold for Outdoor Building

Scaffold Steel Plank Scaffold for Outdoor Building

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffold Steel Plank Scaffold for Outdoor Building

Product Details

Basic Info.

Model NO.:SD03

 

Material:Steel

Type:Fixed

 

Structural Style:Doors Scaffolding

Framework:Frame Combined Scaffolding

 

Supporting Mode:Floor Type Scaffolding

Lapping Form:Frame Scaffolding

 

Erection Position:Internal Scaffolding

Move Method:Horizontal mobile Scaffolding

 

Scaffolding Part Type:Scaffolding Frames

Working Size:95cmx185cmx170cm

 

Steel Pipe Size:Dia43mm X Thickness 2.3mm

Anti-Rust Treatment:Galvanize Zinc

 

Universal Wheel:Optional

Package:Bare Product

 

Net Weight:92kg

20/40/40hq Container:230/460/570sets

 

Export Markets:Global

Additional Info.

Trademark:Rider

 

Packing:Carton

Standard:CE

 

Origin:Zhejiang, China

HS Code:9401809090

 

Production Capacity:5, 000PCS/Month

Product Description

Working size: 95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: Galvanize zinc
Universal wheel: Optional

Shipping information:
Package: Bare product
Net weight: 92kg
Qty for 20/40/40HQ container: 230/460/570sets

Attention:
Bare product without carton
Universal wheel isn't included
.
More products:

ModelSpecificationPacking info.Note
SD01Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD02Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD03Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 200/440/480sets
Bare product without carton
Universal wheel isn't included

Scaffold Steel Plank Scaffold for Outdoor Building

Scaffold Steel Plank Scaffold for Outdoor Building


Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q: There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ??5800m2
Q: Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
Q: How to do a good job of typhoon during the mass transfer mobilization work
Such as: all kinds of dangerous housing, plant, shed, temporary buildings (such as walls, etc
Q: I would like to know what the scope of responsibility for the construction engineering supervision is specific
Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords