• Scaffold Steel Plank Scaffold for Outdoor Building System 1
  • Scaffold Steel Plank Scaffold for Outdoor Building System 2
Scaffold Steel Plank Scaffold for Outdoor Building

Scaffold Steel Plank Scaffold for Outdoor Building

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffold Steel Plank Scaffold for Outdoor Building

Product Details

Basic Info.

Model NO.:SD03

 

Material:Steel

Type:Fixed

 

Structural Style:Doors Scaffolding

Framework:Frame Combined Scaffolding

 

Supporting Mode:Floor Type Scaffolding

Lapping Form:Frame Scaffolding

 

Erection Position:Internal Scaffolding

Move Method:Horizontal mobile Scaffolding

 

Scaffolding Part Type:Scaffolding Frames

Working Size:95cmx185cmx170cm

 

Steel Pipe Size:Dia43mm X Thickness 2.3mm

Anti-Rust Treatment:Galvanize Zinc

 

Universal Wheel:Optional

Package:Bare Product

 

Net Weight:92kg

20/40/40hq Container:230/460/570sets

 

Export Markets:Global

Additional Info.

Trademark:Rider

 

Packing:Carton

Standard:CE

 

Origin:Zhejiang, China

HS Code:9401809090

 

Production Capacity:5, 000PCS/Month

Product Description

Working size: 95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: Galvanize zinc
Universal wheel: Optional

Shipping information:
Package: Bare product
Net weight: 92kg
Qty for 20/40/40HQ container: 230/460/570sets

Attention:
Bare product without carton
Universal wheel isn't included
.
More products:

ModelSpecificationPacking info.Note
SD01Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD02Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD03Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 200/440/480sets
Bare product without carton
Universal wheel isn't included

Scaffold Steel Plank Scaffold for Outdoor Building

Scaffold Steel Plank Scaffold for Outdoor Building


Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
Q:Such as the title, raw materials and structural parts What is the difference, how to divide?
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords