Tower Scaffolding for Building Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Tower Scaffolding
Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and
has excellent stability and bearing capacity. It has been widely used in the construction of industry
& residential buildings , bridges, tunnels and dam project, etc.
Characteristics:
◆ High degree of standardization.
◆ Easy storage and transportation
- Q:How far should the tower crane be from the outer wall?
- " If you want to 2011 or the model, you can choose to update the specifications of the recent update
- Q:I am in urgent need of emergency contingency plans I am very anxious ah
- You can refer to the "town gas design specifications" above should be a detailed description
- Q:What are the main points in the inspection of building safety data?
- Better with styrofoam, that is, can be insulated and heat.
- Q:What kind of special jobs are available at the construction site?
- 62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
- Q:What is the difference between the inside and outside of the car
- The ambient temperature is low so the cooling mode does not start. Heating outside the machine first start, the machine delay start, and need to run for a while only hot air
- Q:Site fastener consumption of more than 40 million, 2500 tons of steel, the site of the general loss of how much? Stealing certainly some of its power child duo twist Xinwai tears goose enamel times is buried and concrete buried. Done the site can talk about the general loss of how many of your work down? More
- Pay attention to check, remember to take a ,,,
- Q:What are the contents of the safety and civilized construction measures?
- The loss rate of the working material, the project as a unit for assessment, assessment period for the project construction period. Loss rate with the company to improve the management level to adjust, according to the following objectives for assessment. Steel pipe: loss rate of 1.8% or less Fastener: loss rate of 3.5% or less steel mold: loss rate of 3.5% within the quick release combination template and support part: loss rate of 3.5% or less bowl button scaffolding: loss rate of 1.8% Inside the door scaffolding: loss rate of 1.8% or less
- Q:What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
- Q:How is the tower crane on the site raised?
- The roof of the color steel composite panels can be applied to the roof insulation layer of the fixed amount of conversion in the fixed amount of the main material; because the quota is different, you use the fixed quota in such a quota on the direct application of no use of similar quota conversion material
- Q:What are the basic processes of civil engineering need to prepare the construction program
- The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Scaffolding for Building Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches