Scaffolding metal scaffold plank/Aluminum Board
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m
- Supply Capability:
- 100000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding metal scaffold plank
1.Length: 5’ 6’ 7’ 8’ 9’ 10’ (1524mm 1829mm 2133mm 2438mm 2743mm 3048mm)
2. Width: 9” (228.6mm)
3. Height: 2.5” (63.5mm)
4. Thickness: 1.8mm
5.Hook thickness:6mm
We can supply all kinds of galvanized steel plank with hole and without hole ,width:210 - 240mm ,thickness:1.1- 2.0mm.
Name | Scaffolding metal scaffold plank |
Main Material | Q235/Q345 |
Certificate | OSHA |
Service | OEM Service available |
MOQ | one 20' container |
Payment | L/C,T/T |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
Aluminum Board
Features
Description: 10' X 19' Aluminum Scaffold Walk board
Material: Aluminum 6061-T6
Finish: Anodized
Size: 19 inch wide and 10 foot in length /As your request
Weight: 39 lbs.
Loading capacity: 792lbs.
Constructed of all aluminum, this aluminum scaffold walk plank has three broad replaceable hooks
Off-set hooks allow continuous decking
Related products
Galvanized Steel Scaffold Plank / Aluminum Deck
in bulk ,pallet or as you request
- Q:i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
- regularly clean it with salty lukewarm water and cover it up with tape
- Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
- 5, Pankou scaffold disassembly do very simple, a person needs only a hammer can do the installation and removal of the entire process. Construction efficiency greatly improved, two construction workers only 1 days to complete the construction site 350m3.
- Q:So, 12 Days Ago I Went To Blue Banana To Get Scaffolding On My Right Ear. Everything Went Fine And They Did A Brilliant Job. I Clean It With Sea Salt Soaks 2-3 Times A Day And Use A Bit Of Tea Tree Oil After To Help Sooth. I Was Just Wondering From People Who've Experienced This Piercing How Long It Took For Yours To Stop Hurting And The Time It Took For The Swelling To Go Down (: Thank You lt;3
- No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
- Q:how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
- Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
- Q:what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
- Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
- Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q:there is also shrubs and trees planted on the base of the wall and 14 feet from it
- you should have thought about all this before you bid. Now it`s your problem
- Q:looking for a scaffolding job in dubai can anyone help?
- Hi okorder , we are Dubai based scaffolding contractor.
- Q:Rather than buy tensile steel rods to reinforce concrete I wonder whether I can effectively recycle scaffold tubes that are presently on my roof.
- inthisall.chills.it A very informative website, kindly stay a minute in website and enter you email address for getting your answer.
- Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding metal scaffold plank/Aluminum Board
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m
- Supply Capability:
- 100000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords