• Standard Scaffolding Scaffolding System Steel System System 1
  • Standard Scaffolding Scaffolding System Steel System System 2
  • Standard Scaffolding Scaffolding System Steel System System 3
Standard Scaffolding Scaffolding System Steel System

Standard Scaffolding Scaffolding System Steel System

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3 m.t.
Supply Capability:
1000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Standard Scaffolding Scaffolding System Steel System


Product Description:

1).Frame system scaffolding is light duty,easy to erect and walk through,wide appciations for both inside and outside constructions.

2).Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

3).Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

4).Frame system scaffolding   can be used for the building decoration which is the light duty scaffolding,it is more easier for moving.


Advantages:

1.Steel-frame scaffolding

2.Swivel 8 inch caster with brakes

3.Adjustable

4.Fold easily for storage


Standard Scaffolding Scaffolding System Steel System


Standard Scaffolding Scaffolding System Steel System


Standard Scaffolding Scaffolding System Steel System


Standard Scaffolding Scaffolding System Steel System


 

Use: 

Presented like a shape of door,Frame-connected Scaffolding includes main frame,horizontal frame,cross brace,stage board and adjustable base. In order to display frame with coupler system enough, good performance of stability, firm structure of the whole, easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

Material: 

Q235 or Q345


Finishing: 

Hot dip galvanized or painted(anti-rustiness).

 

FAQ:

What is our service to you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.   

    We can provide you the professional design team.   

    We can provide fashionable and newest styles for you.   

    We can design the artwork for you.   

OEM accepted--please feel free to customize. 

Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
Q:the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
Of course, you can make your own soil to do a radius of 4 meters small cloth machine
Q:for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords