Ringlock Scaffolding Steel Platforms

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Finish:
EG,HDG,Painting

Packaging & Delivery

Packaging Detail:Pallet
Delivery Detail:within one month

Specifications

Ringlock System
1. Vertical,Ledger,Transom,Diagonal Brace,Base Jack
2. EG, Dip Painting,HDG
3. Pallet Package
4.Q235,Q345

Ringlock System
1. Vertical,Ledger,Transom,Diagonal Brace,Base Jack
2. EG, Dip Painting,HDG
3. Pallet Package
4.Q235,Q345

Ringlock Scaffolding
Widely welcome around the world

Ringlock System is composed by Standard, Transom, Ledger;Diagonal Braces, board,etc...

We have a capability of 1000 Metric tons per month

We can supply Dip Painting Surface, HDG Surface and EG Surface

Ringlock componentSpecification (mm)Weigtht (kg)Material

Standards with Spigot5003.09Q235/Q345
10005.49
15007.90
200010.30
300015.11
350017.51
Ledgers 7503.20Q235
10004.07
10654.31
12004.78
15005.88
20007.56
22008.30
25009.35
300011.13
Ladder300017.80Q235
Braces 750x20009.18Q235
1000x20009.47
1500x200010.31
2000x200011.40
2500x200012.67
3000x200014.06


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Among them, the proportion of steel pipe fastener scaffold is larger, and the door type scaffold is mainly used for decoration and indoor construction
Q:How do I get permission to go on to scaffolding?
You can rent one of your own. Getting all the contractors, owners and subcontractors to let you sign a waver will not get you far ... in the end if you fall off, your survivors will still sue.
Q:What are the requirements for the erection of the bowl - shaped steel tube scaffold
Scaffolding is also called full house scaffolding, its focus from low to up as follows: the pole is the thickness of 5cm plate, and the length of not less than 3 cross; sweeping bar is complete, height is not more than 10cm
Q:Wankou scaffolding steel pipe scaffold and look like
Each node of the bowl buckle scaffold is made of a button which is shaped like a bowl, and the frame body is built,
Q:What are the requirements for the foundation and foundation treatment of bowl - shaped steel pipe scaffolding
Landing bowl-scaffold when erecting height H is less than or equal to 20m according to the ordinary routine shelf erection, erection of a height when H > 20m and ultra high, heavy and large span of the template support system must make special construction design and structural analysis and calculation.
Q:Where can I buy Web-Tex scaffolding?
you can also search the inter for the best supplier of that product......
Q:Scaffold piercing question?
They can't use one of the holes you already have. Things won't line up properly and it won't heal. They will make the new hole either higher or lower, depending on how high your cartilage piercing is at the moment. I would assume they would try and make it higher, but it is about what will be best for the piercing.
Q:Scarlet letter Scaffold scenes?
There are obviously different printings of the Scarlet Letter, but I do remember this: 1st: Chp 2 2nd: Chp 12 3rd: Chp 23
Q:my scaffold piercing wont stop bleeding, really scared, please help?
Did you try peroxide? Put some on a cotton ball and clean around the piercing. If this does not go away within two days and the bleeding persists your body may be rejecting the metal from your skin. This will cause the peircing to eventually migrate out. Go back to the piercer and see what they say.
Q:How to help a scaffold piercing heal?
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range