• Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM System 1
  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM System 2
  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM System 3
Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM

Ringlock Scaffolding for Construction with SGS AS/NZS1576.3 Qualified CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Special-Shaped Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Materials Standard:Q235, Q345

  • Materials Specification:48.3*3.25mm, 48.3*3.0mm, 48*2.5mm

  • Qualified Certificate:SGS Test Report, ISO9000, Coc

  • Surface Treatment:Hot DIP Galvanized, Power Coated, Electroplated

  • Standard Size:0.5m, 1m, 1.5m, 2m, 2.5m, 3m

  • Ledger Size:0.6m, 0.9m, 1m, 1.2m, 1.5m, 1.8m, 2.0m, 2.5m, 3m

  • Production Ability:10 Tons Per Day

  • Procedure:Cutting, Drilling, Welding, Galvanized, Assembling

  • Export Markets:North America, South America, Southeast Asia, Western Europe

  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM

  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM



  • Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified CNBM


  • Descriptions of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.

  •  

  • Ringlock scaffold has the following features:

  • Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

  • Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable



  • The System of Ringlock Scaffolding for  Construction with  SGS AS/NZS1576.3 Qualified 

  • Ringlock
    Scaffold
    System
    Standard
    Q345 tube
    48.3*3.25
    ProcedureSizeWeight(kg)SurfaceCertificate

    1.Cutting

    2.Drilling

    3.Plating    cutting

    4.Forming

    5.Welding

    6.Remove welding slag

    7.Galvnize

    8.Surface finish

    9.Assembling

    10.Packing

    11.Logistics
    0.5m2.96HDGSGS ISO EN
    1.0m5.33HDGSGS ISO EN
    1.5m7.73HDGSGS ISO EN
    2.0m10.06HDGSGS ISO EN
    2.5m12.42HDGSGS ISO EN
    3.0m14.78HDGSGS ISO EN
    Ledger
    Q235 tube
    48.3*3.25
    0.73m3.81HDGSGS ISO EN
    1.09m4.93HDGSGS ISO EN
    1.40m6.44HDGSGS ISO EN
    2.07m8.71HDGSGS ISO EN
    2.57m10.64HDGSGS ISO EN
    3.07m12.41HDGSGS ISO EN
    Brace
    Q235 tube
    48.3*2.5
    1.5*2m9.04HDGSGS ISO EN
    2.0*2m10.05HDGSGS ISO EN
    2.5*2m11.42HDGSGS ISO EN
    3.0*2m12.13HDGSGS ISO EN
    Bracket
    Q345 tube
    48.3*3.2
    0.35m4.5HDGSGS ISO EN
    0.75m6.7HDGSGS ISO EN
    1.1m9.9HDGSGS ISO EN
    Plank
    Q235 
    1.5mm
    1.8mm
    0.73m5.1HDGSGS ISO EN
    1.09m6.9HDGSGS ISO EN
    1.4m8.85HDGSGS ISO EN
    2.07m12.11HDGSGS ISO EN
    2.57m15.02HDGSGS ISO EN
    3.07m17.69HDGSGS ISO EN
    base
    collar
    0.16m1.7HDGSGS ISO EN
    0.2m2.1HDGSGS ISO EN
    Toe
    board
    wood
    15*1.5cm
    0.73m2.16anti-fire ISO EN
    1.09m2.98anti-fire ISO EN
    1.57m4.12anti-fire ISO EN
    2.07m5.75anti-fire ISO EN
    2.57m6.88anti-fire ISO EN
    3.07m7.98anti-fire ISO EN
     
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
yeah that is a better idea. it prevents the bar from getting ripped out, rejecting, and generally makes it less likely to get caught up in your hair while it's still sore.
Q:The role of the external scaffolding and the relevant provisions?
Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:The basic form of external scaffolding
The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
Q:Erection of steel scaffolding tools and safety supplies
Wrench, hammer, wrench, short scaffolding level and a folding rule
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
Q:I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
u shud check f its swollen and if there is more painin go to the doctors
Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords