Ringlock Scaffolding for Decoration with SGS Qualified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Ringlock Scaffolding for Decoration with SGS Qualified
Type:Fixed
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Materials Standard:
Materials Specification:
Qualified Certificate:
Surface Treatment:
Standard Size:
Ledger Size:
Descriptions of Ringlock Scaffolding for Decoration with SGS Qualified
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.
Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable
The System of Ringlock Scaffolding for Decoration with SGS Qualified
Ringlock
Scaffold
SystemStandard
Q345 tube
48.3*3.25Procedure Size Weight(kg) Surface Certificate
1.Cutting
2.Drilling
3.Plating cutting
4.Forming
5.Welding
6.Remove welding slag
7.Galvnize
8.Surface finish
9.Assembling
10.Packing
11.Logistics0.5m 2.96 HDG SGS ISO EN 1.0m 5.33 HDG SGS ISO EN 1.5m 7.73 HDG SGS ISO EN 2.0m 10.06 HDG SGS ISO EN 2.5m 12.42 HDG SGS ISO EN 3.0m 14.78 HDG SGS ISO EN Ledger
Q235 tube
48.3*3.250.73m 3.81 HDG SGS ISO EN 1.09m 4.93 HDG SGS ISO EN 1.40m 6.44 HDG SGS ISO EN 2.07m 8.71 HDG SGS ISO EN 2.57m 10.64 HDG SGS ISO EN 3.07m 12.41 HDG SGS ISO EN Brace
Q235 tube
48.3*2.51.5*2m 9.04 HDG SGS ISO EN 2.0*2m 10.05 HDG SGS ISO EN 2.5*2m 11.42 HDG SGS ISO EN 3.0*2m 12.13 HDG SGS ISO EN Bracket
Q345 tube
48.3*3.20.35m 4.5 HDG SGS ISO EN 0.75m 6.7 HDG SGS ISO EN 1.1m 9.9 HDG SGS ISO EN Plank
Q235
1.5mm
1.8mm0.73m 5.1 HDG SGS ISO EN 1.09m 6.9 HDG SGS ISO EN 1.4m 8.85 HDG SGS ISO EN 2.07m 12.11 HDG SGS ISO EN 2.57m 15.02 HDG SGS ISO EN 3.07m 17.69 HDG SGS ISO EN base
collar0.16m 1.7 HDG SGS ISO EN 0.2m 2.1 HDG SGS ISO EN Toe
board
wood
15*1.5cm0.73m 2.16 anti-fire ISO EN 1.09m 2.98 anti-fire ISO EN 1.57m 4.12 anti-fire ISO EN 2.07m 5.75 anti-fire ISO EN 2.57m 6.88 anti-fire ISO EN 3.07m 7.98 anti-fire ISO EN
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
- Crossbar HG-30 3001.67HG-60 6002.82HG-90 9003.97HG-120 12005.12HG-150 15006.28
- Q: What issues need to pay attention to the construction of high-level scaffolding
- Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
- Q: Please help me in building professional people (scaffolding)
- Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding
- Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
- Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
- Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
- Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q: Scaffolding scaffolding erection norms which requirements, who can say?
- The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
- Q: What is the difference between Scaffolding and Zone of Proximal Development?
- Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
- Q: So, 12 Days Ago I Went To Blue Banana To Get Scaffolding On My Right Ear. Everything Went Fine And They Did A Brilliant Job. I Clean It With Sea Salt Soaks 2-3 Times A Day And Use A Bit Of Tea Tree Oil After To Help Sooth. I Was Just Wondering From People Who've Experienced This Piercing How Long It Took For Yours To Stop Hurting And The Time It Took For The Swelling To Go Down (: Thank You lt;3
- No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
- Q: improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Send your message to us
Ringlock Scaffolding for Decoration with SGS Qualified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords