Ring Locked Scaffolding with Rapid and Economic

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Ring-lock Scaffolding

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction. 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Ring-lock Scaffolding

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3.   Ring-lock Scaffolding Images


      


4.   Ring-lock Scaffolding Specification

     .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load

     .Design load of cross bar




    .Design Lord of base:Pmax=60KN

 

5.   FAQ of Ring-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification for bowl buckle scaffold for construction purposes (JGJ166)
In addition, I did not hear that JGJ166-2008 has a new version of ah, it is JGJ130-2001 "construction of steel tubular scaffolding safety technical specifications" in the second half of the new version of JGJ130-20112011 December 1st implementation
Q:I Got A Scaffolding/Industrial Piercing!?
Thats an awesome piercing, nice job! I'm not laughing about being unable to unscrew it - I have a piercing in my pinna I've never been able to get out - had it for like 6 months. What I will say it that you shouldn't be taking it out yet really anyway. If you wash it in sea-salt and warm water once a day it should be almost totally healed in 8 weeks, which is still about two weeks away if you got it on the 16th Feb. Even then for the first 6 months or so it'll close pretty quickly (not in like an hour or anything, but it could get tighter in as little as 3 or 4 hours), so you should try to leave it in all the time for that 6 month period.
Q:I need to sell some scaffolding?
Use okorder.com, okorder.com, hope these help.
Q:I have a rather unattractive lump on my scaffold piercing, and i have no idea what to do with it?
Sea salt soaks are your best friend. Try them, twice a day on your lump, it usually goes away after a week with this. If it doesn't, then I would go to the piercer and ask them about it, tell them to have a look, maybe they know something more. But try the soaks first.
Q:Bowl buckle scaffold steel pipe specifications should be mm
Rod: LG-120 (diameter 48*1200); LG-180 (diameter 48*1800); LG-240 (diameter 48*2400); LG-300 (diameter 48*3000).
Q:What are the specifications for the setting of the wheel - fastener scaffold
Technical code for safety of steel tubular scaffold with couplers in construction
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:Why is bamboo used as scaffolding in China and Hong Kong?
The reason is simple.....Bamboo will bend in the event of a typhoon and is thus safer than steel scaffolding.
Q:Why not connected with the bracket or arch construction scaffolding
2 the support column must fall on the foundation with enough bearing capacity, the bottom end of the column must be provided with a backing plate or a concrete cushion block. The foundation of the support is forbidden to be soaked by water, and the measures to prevent frost heave must be taken in winter construction.3 both sides of the support hole should be reinforced, the night should be set warning lights. In the construction of the river which is easy to be affected by drifting objects, a strong protective device should be set up.4 installation bracket and arch process, should be installed with the erection of temporary support. The multilayer bracket, horizontal plate bracket should be horizontal, vertical column should, on the lower column should be in the same center line.5 frame or not connected with the construction scaffolding and arch bridge.
Q:Is there a way to find out when specific scaffolding is scheduled to come down in New York City?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range