Multifunctional usage grasping machine with 1000kg
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 15 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details Type: Grasping machine Use: Agriculture, crops, sugarcane, wood, timber, steel Certification: ISO9001:2008 Model Number: YGL60-1000 grasping machine Condition: New After-sales Service Provided: Engineers available to service machinery overseas Machine weight: 4720kg Engine Power: 47kw/2400rpm Max Grasping weight: 1000kg Fixture width: 840mm Overall Dimension: 4700*2210*2630mm Back-end swing radius: 1780mm Max gripping diameter radius: 4600mm Max loading height: 5700mm Max vertical uninstall height: 5000mm Max clamping force: 36kn MODEL:YGL60-1000 Multifunctional Grasping Installed Machine Specification Weight(kg): 4720 Engine Engine Power(kw) 47 Engine Speed(rpm) 2400 Overall Dimensions(L*W*H)(mm): 4700x2210x2630 Fixture Fixture Width(mm) 840 Performance Parameters Travel Speed(km/h): 30 Swing Speed(rpm): 5 Operation Range Max Grasping weight(kg) 1000kg Back-end swing radius(mm) 1780 Max Gripped Diameter radius(mm) 4600 Max loading height(mm) 5700 Max Vertical uninstalled height(mm) 5000 Max Clamping Force(kn) 36 Mini turning radius(mm) 3300 Max Caught diameter(mm) 5000 Hydraulic System Rated Pressure(mpa): 18 Wheel Tread(mm) Front 1910 Back 1700 Wheel Base(mm) 2230
- Q: I'm an engineer. I was employed at a rather large company that manufactures heavy duty off road vehicles, (Wheel Loaders and Excavators and such). Recently, I've lost my job because the quot;higher upsquot; in my company decided to cut costs. They hired an engineer from India to replace me at a fraction of the cost of my wage. I'm middle class and when I see these people with six figure incomes it makes me question their true worth? They will argue that it's actually positive for our the company and our ecomony, but as I sit here typing this, (unemployed), I wonder....who are the ones benefitting? I am unemployed. I don't build bulldozers any longer but they are still being built. These bulldozers clear the land for the house that I can no longer afford. The carpenter, plumber, electrician, etc. don't have a job because the house was never built. They don't have to buy tools anymore either. The trucks that deliver those tools will be parked. I wish I could type more, but you get the point!
- Hi, okorder
- Q: I want to consider digging a hole for the foundation of an addition with crawl space to my home. This hole would have to be at least 4 feet deep for the frost line and would have to be the perimeter of the addition so 40 or more feet depending on how big of an addition. My question is, what are my options for digging this monster hole?I know I can always do the shovel and pickax route. And I know I can rent a mini excavator for about $200 a day from stores. Does anyone have any other inexpensive ways or some creative ideas that I could use to make this job a little easier?
- Try rental places, but you will find costs of $500 a day for a backhoe to do the work with.
- Q: How does lol excavator put off site?
- Your position is the starting point, the direction of the mouse is the maximum and the distance is the destination
- Q: i don't. supposedly he got eaten to death by piranhas!do you believe its true or not?
- No, the whole instant skeleton feeding attack is a myth. When a cow was fed to hordes of piranhas instead of the few in a normal pack to make an instant skeleton they were trapped and starve while the cow was cut up into strips. The body in the pics looks fake.
- Q: LOL excavator correctly installed
- Then, the choice of the color of the wild knife, the white punishment, no one does not use, not to discuss. The excavator belonged to the GANK and control pattern jungler instead of harvesting the juggernaut and werewolf like wild type or single red, so the single output bias challenge and singled punishment is not considered. The excavator has a W hit fly, with E drill dash and flash is controlled relatively stable, then slow down discipline to keep the W blue and strike with his teammates to keep people is very important, so in most cases is to upgrade the discipline of blue. If the early by anti wild miserable, poor development, need to quickly fill fill level under the condition of development, through the upgrading of discipline to speed up the efficiency of wild purple brush up grade can be considered, but not the most preferred purple punishment, because the Desolator excavator efficiency, improve the efficiency of punishment is not dependent on purple desolator.
- Q: Hi everyone I'm an Australia moving to Norway at the end of the year and I'm looking for work as a excavator operator in or around Stavanger. can any one help please?
- I did a quick search on the main job site in Norway, and I found two positions that fit the bill. www.finn.no/finn/job/object?finnk... www.finn.no/finn/job/object?finnk...
- Q: I am buying a home that has a large shed in the back. The loan is FHA and the appraiser requires it be torn down or repaired. This is an old shed close to 100 years old and was built with all 2x4s with many rotting pieces so fixing it would cost the same as rebuilding a new one. The shed is approx 15x24 in an L shape. I'm working with a contractor for the other repairs and he quoted me at $7,500 for a full demo, I said leave the floors and he brought it down to $5,500. This seems like a rather large amount especially looking around online I was expecting 2-3k at most. Is his quote realistic? Im under a deadline so I had him write it up but I most likely will do it myself or find someone with a excavator to come in and just crush it.
- The longer you wait the harder it will be. You can get an electric jackhammer from Home Depot, they rent them.New concrete gets harder by the week useally by 28 days it reaches the hardness its going to be
- Q: Hi All,the scenario is..A compny wants to develop dbase to allow hiring of equipment to client. Company has 2types of equipment, power tools i.e drills and vacuums, and plants i.e. excavators and rollers. Power tools r decribed by model + voltage, plants r classified by model+ size in tonnes. Compny has various outlets, each outlet has staff including a Manager, and several Senior Technicians who are responsible for supervising the work of allocated groups of technicians. Each outlet has stock of equipment for hire that may be hired by clients for various periods of time, from a min of 4 hours to max of 6 months. Each hire agreement between a client and the company is uniquely identified by hire number. Client must take insurance cover for each equipment hire period. All equipment is checked for faults when returned by the client.Entities identified(are there any more?are any incorrect?): Equipmet Power Tools PlantsOutletSenior Technician TechniciansClientHire
- could you help me ? if you have this answer now please
- Q: People Of The Hunting Section! I need some basic help. I sometimes do a bit of backwoods reloading on shotgun shells and I am trying to make a few door breeching rounds. The door is a 1/8quot; mild steel wrapped hollow door with inside hinges. I need a basic load / shot pattern to be able to penetrate the door and get it off the hinges. We have already tried to kick it down and only succeeded in a broken ankle. I was thinking of just turning either a copper or steel slug and just going at it, but I figure it would be worth some different opinions.Thank You!
- Have you thought of a cutting torch? Sounds easier, but not much fun. There are special door breaching rounds that you can purchase. I would think several slugs would upset the integrity of the door.
- Q: I have just purchased a JD 190e and want a recommendation on what grease gun to use to grease the tracks
- A regular sized one will do just fine. You know...the one that uses tubes of grease about the size of a tube of bathroom caulk. I'd get one with a flexible hose as opposed to a fixed one. That way, you'll be able to get to the tough ones without having to maneuver the machine as much.
Send your message to us
Multifunctional usage grasping machine with 1000kg
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 15 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords