• Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 1
  • Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 2
  • Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 3
  • Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 4
  • Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 5
  • Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane System 6
Lifting Equipment Crane for Hydro-Power Plant  Gantry Crane

Lifting Equipment Crane for Hydro-Power Plant Gantry Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
3 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

TYHI’s cranes can be found in hundreds of hydropower plants all over China. As the dominant supplier of heavy duty EOT and gantry cranes for hydro-power plants, we can both supply EOT cranes for generator houses or gantry cranes for dam spillways. We also can provide turnkey contract services, including design, manufacture, transport, installation, commissioning, load testing and licensing.

We produced the 350t gantry crane for the Three Gorges Dam spillway—the first spillway crane made in China. Since its first went into operation in 1961, this crane has lifted the dam gate over 400 times on average each year. It is often overloaded, even servicing loads of more than 540t, and yet, the crane still runs very well without any kind of malfunction.

TYHI also produced the 500t gantry crane for the Longyang Gorge Dam; the largest snake-rail gantry crane made in China. It has continuously functioned well despite the challenges of extreme altitude, cold weather, and flooding. For this, the crane has won the National 1st Level Technology Improvement Award.

In 2002 TYHI supplied five 500t spillway gantry cranes for the Three Gorges Dam. Moreover, we have supplied hundreds of spillway gantry cranes for hydropower plants both at home and abroad.

 

Our main products include lifting equipment, forging equipment, rolling equipment, excavation equipment, coke oven equipment, coal chemical equipment, wind power generating equipment, oil film bearings for rolling mills, gear drive equipment, train wheels and axles, forgings and castings and project contracting.

 

Our key products include our 1200t EOT crane, our 500t ladle crane, our 75m³ shovel for mining, our Φ180mm continuous rolling production line, our 110 MN aluminum alloy extrusion press and our 7m top charging coke oven equipment. 

 

TYHI’s products are widely used in the metallurgical, mining, energy, transportation, aerospace, chemical, rail, ship building, environmental protection and various other industries. Many products designed and manufactured by TYHI have filled gaps in the domestic market. Furthermore, we have created 360 nationally and internationally recognized products which have been exported to approximately forty countries and regions.

 

TYHI is now delving further into the development of the rail, engineering machinery, new energy, and maritime equipment fields. We have established a new production base in the Binhai New Area of Tianjin to facilitate the transportation and export of large-sized equipment. Our second wheel production line is currently under construction. We have also established production lines for wheels, axles and wheel sets for use at speeds above 200 km/h.

 

We are now turning our focus to international markets which we are certain can benefit from our high quality products and service. As we are constantly innovating and improving, we have no doubt that we will meet and even exceed our customers’ expectations.

 

 

Q: I will take my parents who are in their 80'sThey are in good shape but they don't swim, fish, nor skiI am open to any suggestions or ideas about things they can do to enjoy their visitThank you.
The primary draw of Yosemite NP is the scenery and there's ample to be had in the Valley, which will be the only place you can get to in the dead of winter by car anywayWhen we were there in January my family and I walked to Yosemite Falls from Yosemite Lodge which is paved and only icy once we reached the fallsNo one but us continued across the bridge and down a trail that led back to the roadThe next day it began to snow and we hiked with our umbrellas and winter gear around the Valley, crossing the Merced River, walking along the path by the nearly empty road and had lunch near the Valley StoreAfter lunch we hiked to the Ahwahnee hotel and then went into the woods on a trail that led through the deserted Upper Pines campground where we finally picked up the free shuttle and returned to the lodgeLater we took the bus to the visitor center, museum, and Miwok Village and rode the bus to Camp Curry where we found the restaurant closed for private use and the ice skating rink closed due to the snow, and the bus took over half an hour and we got a bit coldWe finally had dinner at the buffet restaurant across from the lodgeOvernight it snowed more and we had to use tire chains in the morningOn the way home we stopped at the snow play area near Crane Flat which is down a long ice covered road and offers only a trailhead for x-country skiers and no snow play areaOnce we left the park the road had been plowed and we could take off our tire chainsFor some reason the roads inside the park aren't plowed, sanded and salted like the rest of the roads in the Sierra?
Q: If I were to download something in a virtual machine and it got a virus, is it possible that the host could get the virus too? It is one single file that is used as a complete hard disk, but if soemthing were to happen, I just want to knowI don't usually use any sort of anti virus software in my VMs, so I am just a bit concerned about security.
not normally, this is why hackers and virus writers and anti virus writers use them.
Q: I've already tried it but I'm not sure I got the right answer because I don't have the answer key and I can't find it on the internet.quot;A motor having an efficiency of 88% operates a crane having an efficiency of 42%With what constant speed does the crane lift a 410-kg crate of machine parts if the power supplied to the motor is 5.5kW?quot;You don't have to tell me how to do it, I just want to see the answer you come up with.
6.02 time 10 to the 23rd
Q: During the aftermath of ww2? when and where did they begin? and when were they demolished?
Most are still standing there were Hunderds Of High Rises in Lambeth all looked the same because Most of the Terraced Houses were Built directly on the Earth No foundations the shock waves from Bombs caused these Buildings to Fall down so In went High Rises and as people Got Rich they wanted Flats overlooking the Royal Parks I watched the council move in with a Big steel ball on a crane knock down Bombed Buildings Lay slabs and Cover the area with Prefabs houses that were on the Back of a Trucks in Kit Form as the demand for Houses Grew Up went the the High Rise flats so I would say from memory about 1949 The first 10-storey council housing block opened in Holborn in May 1949High-rise housing was the solution to London’s growing population, replacing housing lost during the war and London’s slumsBy the 1960s, over half a million new flats had been built, many of them in tower blocksThe first major public building to be constructed in London after the War was The Royal Festival Hall on the SouthbankOpened as part of the Festival of Britain in 1951, it later became the first post-war building to be awarded Grade I listingMy friends Lived in one of these Blocks of Flats and on the estate there were 40 Blocks all the same with no trees concrete yards and Behind the Oval Cricket Ground Most are still Standing My school was 4 stories High the tallest in Fulham before WW2 Built in about 1868 and is still a school I paid them a Visit in 2007
Q: What procedures do you need to install second-hand gantry crane?
2, the installation of the installation staff to provide special types of workers, technical supervision bureau will come to check.
Q: Ok so me in my friend in science today were like what if we combined all the elements into one radioactive super element that country probably destroy the whole earth and then eating itI think I discovered how to get superpowers
I am waiting with bated breath for this marvelous huge explosion which will rip the earth asunderHowever if you are making a bomb you will need PURE uranium U235 and U238 and a critical mass which must be assembled in a split second to make the bomb go offThis rapid assembly is what causes the explosionA huge bomb like that is going to be horrendously complex and BIG, requiring qualified engineers, cranes, trucks, and scientists to put it together, not to mention a place to do it and prepare the bombThe size will be enormous, perhaps the size of an entire cityYou will have to save up your weekly allowance.
Q: Why is it heavy-duty?
Actually I made this chocolate sauce for a brownie toppingTake a bit of cocoa powder and a small bit of vanilla and butterHeat to boilingThen mix in at least 3 cups of powdered sugarStir it all in and keep it hot so that it doesn't solidifyPut it on steady heat so that it doesn't solidify but also doesn't boil overThen dunk strawberries and whatever, let them cool and eat.
Q: How do crane operators assemble tower cranes that reach the skylines of cities?
first the inside control is put into place.then the first section of the outside is built.then, they use side jacks to lift the inside up to the next level, and so on til they reach their height goal.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords