JLP6010 ToplessTower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JLP6010

1) JLP6010 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JLP6010

  • Max. working range 60m, tip lifting weight 1.0T and Max. lifting weight 6T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 42

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/55/50/45/40

  • Min working range(m)2.5

  • Max lifting capacity(t) 6

  • Tip load @ 60m(t)1.0


Packaging & Delivery of JLP6010

40HQ container

25~30days after deposit






Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How difficult is white crane boxing?
Frank and Mito are precise IMHO. that is probable a kind linking itself to the previous. optimistically, that is not purely linking itself to the Karate toddler..ha ha. And it probable is on the up and up... yet i could be careful anyhow. This decision can impression your preparation for years. stable success!
Q:what type of crane cam is this?
Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:How long would it take to make 1,000,000 paper cranes if making one takes 7 min & 11 sec?
7*60 / 60 + 11/60 = 420+11 / 60 = 431/60 seconds to make 1. 431/60 * 1,000,000 = 431,000,000 / 60 = 43,100,000/6 = 21550000/3 seconds. 21550000/3 / 60 = 21550000/180 = 2155000/18 = 1077500/9 minutes 1077500/9 / 60 = 1077500/540 = 107750/54 = 53875/27 hours 53875/27 / 24 = 53875/648 = 83.14040987654320987654320... days. 0.1404098765432098765432...*24 = 3.37037037037037... hours. .37037037037037037... *60 = 22.22222222222... minutes 0.2222222222222*60 = 13.333333333333333 seconds. 83 days, 3 hours, 22 minutes and 13 1/3 seconds.
Q:Can the tower crane personnel install the construction elevator?
Although it belongs to the construction of special operations, but the operation of different categories, tower crane demolition workers according to the requirements can not install the elevator!
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...
Q:Why are electromagnets on junkyard cranes generally circular in shape?
Easier/more efficient to make the electrical coil circular than any other shape I guess.
Q:What are Cranes and Derricks used for?
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline. The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:Math help, Two cranes can unload a ship?
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x² - 16x) = 1/15 15(2x - 16) = x² - 16x 30x - 240 = x² - 16x x² - 46x = - 240 x² - 23x = - 240 + (- 23)² x² - 23x = - 240 + 529 (x - 23)² = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range