JIS Type Pressed Double Fixed Coupler Scalffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | Unit Weight: | |||
Outer Diameter: | Raw Material: | Processing: | |||
Standard: | Treatment: |
Packaging & Delivery
Packaging Detail: | Plastic woven bags and steel tray. |
Delivery Detail: | 20 containers/30-40days |
Specifications
Japanese/JIS Type Pressed Double Fixed Coupler:
We are a professional manufacturer of system scaffolds, fittings, props, frame
Japanese/JIS Type Pressed Double Fixed Coupler:
1) Material: Q235, SPHC steel plate.
2) Processing: Pressed
3) Unit weight: 0.56-0.64kg/pc, according to your requirement;
4) Surface: Zinc plating
Company Profile:
Rizhao Weiye Tools Co.,Ltd. is the leading manufacturer of system scaffoldings, couplers, shoring props, fences, steel trays, ladders and other related products in Rizhao City, Shandong Province, China.
Main business:
A. System Scaffolding:
indclude: Kwikstage system scaffolding, Cup lock system scaffolding, Ring lock system scaffolding, Haki system scaffolding and accessories;
B. Fittings:
include: British type couplers, German type couplers, Italian type couplers, American type couplers, Japanese Type Couplers, etc.
C. Shoring props
Quality shoring props with different specifications are available, we can also manufacture as per your designs.
D. Planks:
Aluminum and steel planks with different sizes are available;
E. Frames
Ladder type frames, walk through frames;
F. Others
We can also manufacture quality fences, ladders, steel trays etc.
- Q:Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold, mainly by the cross bar, vertical pole, fasteners (commonly used is the rotation button, right angle button, connecting rod), foot board, etc.
- Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q:would a scaffold piercing look gay on a guy?
- Not gay at all. Plenty of guys have it done.
- Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q:how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
- Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
- Q:Fastener type steel pipe scaffold composed of which components?
- 3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
- Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- okay, if you do end up getting it, make sure you get it on the side you DONT sleep on. dont let shampoo get on it. be really careful with it. if you have longer hair dont let your hair get caught in it cause it'll get tangled on it and it'll hurt and tug on the bar. it's usually around 40 dollars for it. this piercing requires a long time to heal and it has a high risk of infection. but if you take good care of it, you'll be good (: hope this helpedd.
- Q:In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
- The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
- Q:What are the functions and requirements of the masonry wall
- 6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
JIS Type Pressed Double Fixed Coupler Scalffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords