Hot dipped galvanized Standard Ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
- Option:
- system
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Hot dipped galvanized Standard Ringlock system
Features & advantages of hot dipped galvanized:
Nowadays, more and more scaffolding products choose hot dipped galvanized treatment. Because this type of surfacing treament has very good benifits on scaffolding!
As we know scaffolding are used in construction works, it must imfluenced by different weather, complex working environment,human use and crashes when use and storege.
So, scaffolding must suffer many,oxidations, roots and damages. So the scaffolding surface is most likely oxidated and become bad, easy to lead many accident.
So to do a good surfacing treatment to prevent oxidation is very nessessory. But differrent surfacing will have different surface using time. share a commons for these using time:
Painted:1-3month
Dipped painted:4-5month
Galvanized:2-3years
Hot dipped galvanized:5-6years.
Anyway, different treatment will worth different charges, it deponds on you choose, the life is important than everything.
Product specification:
Part description | Thicknesss | Thickness | Lenger | Steel Grade | Surface |
Standard | φ48.3/φ60 | 3-3.25mm | 500-2500mm | Q345 | Hot dipped galvanized |
Ledger/Horizontal | φ48.3 | 3mm | 600/900/1200/1500/1800/2100 | Q235 | Hot dipped galvanized |
Level diagonal | φ48.3 | 3mm | \ | Q235 | Hot dipped galvanized |
Brace/diagonal | φ48.3/φ42 | 2.5mm | \ | Q235 | Hot dipped galvanized |
Production applications:
Our this ringlock system is produce by us Gainford, got good control from income material to end products. Whole product system has big load capacity and multi function benifits, suitable for many purposes, such as bridge construction,boat building,outlook frame for building,railway construction,oil and gas projects and so on.
With it fast erection and good convinient, it could be use for stage, show platform, outdoor AD landmarks and so on.
Welcome send inquiry to us for more info, we glad to support you. !
- Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q:What is the bamboo board for the scaffolding of the building?
- Wooden foot Shouban, bamboo scaffold (including bamboo string board, bamboo fence board) Involving the scaffolding of the main norms are "construction fastener steel scaffold safety technical specifications" JGJ130- "construction scaffolding safety technical specifications" JGJ164-2008 and so on.
- Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
- Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q:Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
- First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
- Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
- Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
- Q:The name of the laws and regulations relating to the building, at least . The The
- Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
- Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
- Historical a place with alot of history attached to it Landmarks
- Q:Can the fifteen typhoon blow up the three - storey house?
- Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hot dipped galvanized Standard Ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
- Option:
- system
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products