Hot Galvanized Ringlock Scaffolding System

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Ring Lock Scaffolding Description 


Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.


 2. Main Features of the Ring Lock Scaffolding


 - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity


3. Ring Lock Scaffolding Images


Hot Galvanized Ringlock Scaffolding System

Hot Galvanized Ringlock Scaffolding System


4. Ring Lock Scaffolding Specification


 material: Q235

 tube size: 48.3*3.2mm 

surfacing: hot-dip galvanized

the usual size: 0.5-3m

We can design and manufacture as per your specific requirements.


 5. FAQ of Ring Lock Scaffolding


We have organized several common questions for our clients,may help you sincerely:

1) What can we supply for you? 

We can supply base jack,ring lock scaffolding system,steel pipe/tubes,etc. 


2) Why choose us?  

• Decade years of experience in the field of scaffoldings 
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price.OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.


3) How about our after-sale service?

Any of your reasonable request will be responsed within 24hours.If you need the

supervision of installation,we could arrange one or two engineers to provide the technic service on-site.


 4) What about the package and shipping time?

Packing:  packed in wooden pallet.  

Shipping: We have various shipping ways for our customers, such as express,by air or by sea,railway,etc.Normally it takes around one month.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What do people think of scaffold piercings on guys? thinking of getting one?
I think the are pretty interesting... I have seen them mostly on girls, I don't know how it look on a guy, try it!
Q:Physics Problem - A 56.0kg painter is on a uniform 23.5kg scaffold supported from above by ropes?
lacking information. How lots stress can each and each rope sustain, how lots tilt will the scaffolding undergo by using circulate. you desire to be lacking some information, that question is unanswerable too many variables.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:Scaffolding step span, span, the vertical rod spacing is how much
Distance refers to the distance between the adjacent two large bars, the middle of a protective bar.
Q:How to calculate the amount of steel tube in the template system of the bowl buckle scaffold?
Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room.
Q:Scaffold Piercings.?
Hurts very bad- cost varies
Q:Scaffold piercing question please help, is it normal?
Gosh Industrial do harm I'm now not going to lie. Cartilage piercings do not harm. But industrials are quite tough to handle. If you'll be able to manage affliction then get it. They're valued at it however they do harm.
Q:scaffolding was put up outside my apartment this morning for repair work to be done to the apartment upstairs?
How about giving your TV a break and enjoying the weather. The scaffold will only be temporary.
Q:Should the WWE bring in New Jack to work scaffold matches with John Cena & Randy Orton?
WWE has no experience in doing scaffold matches. WWE has no interest in hiring New Jack. WWE has no interest in having John Cena and Randy Orton injured and out for months. WWE has already been without The Big Show, Kane, Michelle McCool, The Undertaker, Layla El and Golddust because of injuries. Scaffold Matches were interesting in The NWA in 1986 and 1987, they haven't been interesting for me since then. New Jack, John Cena and Randy Orton are not The Road Warriors, The Rock n' Roll Express or The Midnight Express.
Q:scaffold piercing (industrial) HELP...please ?
1. sorry, i live in the usa, dont know how to convert money. here it was 56 dollars 2. the first hole hurt at about a 5, the second hole i could barely feel. id give it a 0. 3. 4-6 months til you can change it and have it been comfortable, up to a year for it to be completely healed. 4. i got mine done about a month ago, doesnt really hurt anymore, just when you put a lot of pressure on it. lots of cursties, even when i do sea salt soaks, haha. 5. pain for the first week. lots and lots of pain a soreness. then a really cool piercing. 6. not sure about in the uk, but here its 18 and above. if youre a minor you need a parent.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range