Hot-Dipped Galvanized Ringlock Scaffolding

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 m.t.
Supply Capability:
10000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ring Lock Scaffolding

1)Main material: Q345
2)Surface: Hot dip galvanized
3)size: 48.3mmX3.25mm

4)welding: automatic welding technology

5)Certification: ANSI/SSFI SC100-5/05

Vertical:1m,1.5m,2m,3m
Ledger: 732,1088,1400,2072,2572,3072mm

Components: Standard, Ledger, Brace, Plank, Ladder, Base jack, Rosette, Start collar



Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding


Hot-Dipped Galvanized Ringlock Scaffolding


With automatic welding technology ,stable quality ,uniform and smooth surface .






Quality Control

Recognizing that quality control is a key factor that determines success in overseas markets, our factory uses state-of-the-art facilities to ensure products meet the standards in the United States and European countries.

Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding




Packing

Woven bag and pallet , carton, plywood case, as your request.


Hot-Dipped Galvanized Ringlock Scaffolding

Hot-Dipped Galvanized Ringlock Scaffolding




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification and type of scaffold erection
2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Q:scaffold, where to buy?
Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Scarlet Letter: Why does Hester keep her promise to Chillingworth on the scaffold?
Because she owes him since she cheated on him.
Q:What scaffold courses do i need to do to work offshore?
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range