Lago Geomembrana High-Density Geomembrane for Environmental Engineering in Potable Water Systems
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Introduction
Thickness
1mm-3.0mm
width
4-9m
Length
50-100m or as customers' requests
Material
LDPE, LLDPE, HDPE, EVA, ECB, PVC , CPE
Color
Black, white, green, blue, red, grey, and others
Port
Qingdao
Delivery
2-20 days
Packing
woven bag or as customers' requests
Application
1. high quality hdpe geomembrane use in agriculture
1. high quality hdpe geomembrane use in agriculture farm
3. high quality hdpe geomembrane use in shrimp ponds orLotus
4. high quality hdpe geomembrane use in Slope protection impervious
5. high quality hdpe geomembrane use in Landfill anti-seepage
6. high quality hdpe geomembrane use in Agricultural water reservoir:
7. high quality hdpe geomembrane for roof seepage control
Technical specifications of HDPE geomembrane:
a) Density ≥ 0.94g/m2
b) Tensile Strength ≥25Mpa
c) Elongation at Break ≥ 550%
d) Right-angled Tear ≥ 110N/mm
e.)Puncture Strength ≥ 550N
f.) Permeability Coefficient ≤1.0xe-13gNaN/(cm2.S.Pa)
g.) -70oC Low Temperature Impact Brittle Property: good.
h.) Chemical Resistance: at 80oC, marinated in 5g/L Nacl for a long time, it will not erode or swell.
Our Service
1.On a regular basis or as per your request,we entrust national testing agencies to conduct quality inspections
2. Strictly in accordance with the ISO9001-2008 international quality system standard,we monitor and manage the whole process throughout production,quality testing,and measurement to ensure product quality
3. For quality-related construction delay or substandard construction(except for damage or losses due to customer’s responsibility or irresistible natural disasters),we have refunding,replacement,and repair services.We will respond to customers’ feedbacks on quality issues within 24 hours.
After-sales service
1.In order to provide customers with comprehensive technical support,we will provide technical and other related information upon request in a timely manner.
2.In required,we will appoint specialized technicians to the construction site to give technical trainings to construction people,and offer technical guidance throughout the whole construction process.
3.For damage due to shipment and delivery,after we receive the complaint,we will check the issure through provided pictures and videos.If our responsibility is confirmed,we wil offer free replacement.
4.When the construction is completed,as your request,our technical staff may participate in the final acceptance.
FAQ:
Q: What kind of payments does jenor support?
A: T/T, L/C, Cash are accepted.
Q: Do you charge for the samples?
A: Accordeing to our company policy, the samples are free, we only charge the freight fee. And we will return the freight fee during the next order.
Q: Can you produce according to customers' design?
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.
Q: Do you have other products?
A: Yes, please check the pictures:
- Q: How to use geosynthetics impervious device?
- 1. Set pressure. Press the set button "back" and the button ">" after powering on the device. Press the button “+”and“--”, then set pressure. After that press the button "back" to save it. After setting the lower limit value, press the set button to exit. 2. Clear the time setting. Redo the test and continue pressing the "--" button. The time value will be reset to 0 after 10 seconds. Don't press the button during the working time. 3. Check the time. Press the "--" button. The time value accurate to seconds will be shown on the screen. After 30 seconds, pressure value will be shown on the screen again. 4. Adjust to zero. If the pressure setting can't return to zero when the device is powered on without being applied pressure, you can press the reset button once. If the device is under pressure, release the pressure before pressing the button. 5. Open water injection cover plate. Add pure water until the water tank is full. Apply pressure and open pressure regulating valve to let water flow to chassis of high pressure cabin until the water begins to overflow. 6. Put the sample on the net plane of water collectormanifold smoothly. Let the excess water drain away to ensure that there are no bubbles in sample clamping device. Close the perforated plate and fix the sample evenly.
- Q: How do geomembranes contribute to water conservation projects?
- Geomembranes contribute to water conservation projects by acting as a barrier that prevents water from seeping into the ground or escaping through cracks. This helps in the containment and storage of water, reducing evaporation and seepage losses. Additionally, geomembranes can be used to line canals, reservoirs, and ponds, preventing water loss through leakage. Overall, the use of geomembranes ensures efficient water management, enabling the conservation and sustainable use of this valuable resource.
- Q: How do geomembranes prevent water seepage in fishponds?
- Geomembranes prevent water seepage in fishponds by acting as a barrier or lining that prevents water from leaking out of the pond. They are made of impermeable materials, such as high-density polyethylene (HDPE), which do not allow water to pass through. The geomembrane is installed beneath the pond substrate to create a watertight seal, ensuring that the water remains contained within the fishpond and minimizing the risk of seepage.
- Q: What are the main usages and applications of high density polyethylene film (HDPE) in refuse landfill?
- At the same time it can be used for the middle cover, fly eradication and deodorization. HDPE geomembrane is the core of urban household refuse landfill anti-seepage materials.
- Q: How to install the electrothermal film?
- Electrothermal?film can be divided into several categories, namely printing ink, carbon?fiber and metal film. It is all in the form of a roll. To install the electrothermal?film floor-heating system, we must flatten the cement ground first. And then clean it up and install the electrothermal film on the floor. The wires must be parallel connected, insulated, and wrapped in silica gel. The final step is to test. If all goes well, we can continue to install the parquet. The installation of temperature controller is required. After setting the temperature, we can use it normally.
- Q: What's the question need to notice about the construction method of composite geo-membrane?
- Before laying HDPE geomembrane, there should be qualified acceptance documents of civil engineering. 2. Before cutting HDPE membrane, its size should be accurately measured, and then cutting according to the actual size, it commonly should not be cut according to the actual size but should be numbered one by one, and be detailedly recorded on the special form. 3. When laying HDPE geomembrane, welding line quantity should be controled, on the premise of guaranteeing quality, we should try best to save raw materials. At the same time, it's easy to ensure the quality. 4. The joint width of seam between film and film is generally more than 10 cm, usually make the welding line direction parallel to the maximum gradient, namely along the gradient direction. 5. Usually, in a corner and abnormal section, seam length should be shorten as far as possible. In addition to the special requirements, in slope greater than 1: Within the scope of 1.5 meters away from the slopes top or the stress concentration area, welding line should not be set up as far as possible. 6. While laying HDPE geomembrane, in order to avoid artificial fold, when the temperature is lower, we should try to tighten, paving the film. 7, after paving the HDPE geomembrane, walking or moving tools on the film should be avoided as far as possible, the things that will danger the HDPE geomembrane should not be placed on the fil, or carried while walking on the film, to avoid the accidental harms.
- Q: The installation method of soft film ceiling.
- A. The installation method of the PVC corner. 1.To install the PVC bracket supports where the soft film is needed (The supporting objects can be wood beam, aluminum alloy, stainless steel or other things.) 2. Then put the PVC keel angle...
- Q: What are the construction norms of composite geomembrane?
- The composite geomembrane construction process: One, base surface excavation, two, geomembrane pavement, three. align the welding seams, Four. welding, five. site inspection, Six , repair, seven,reinspection, eight, backfill soil
- Q: What are the limitations of geomembranes in acidic environments?
- Geomembranes, although widely used for containment in various applications, have limitations when exposed to acidic environments. Acidic conditions can lead to the degradation of geomembranes, causing a decrease in their mechanical properties and overall performance. Acidic substances can attack and weaken the polymer matrix of the geomembrane, resulting in reduced resistance to punctures, tears, and stress cracking. Additionally, acidic environments can accelerate the process of oxidation, leading to premature aging and reduced lifespan of the geomembrane. Therefore, it is crucial to consider the limitations of geomembranes in acidic environments and implement appropriate measures such as selecting acid-resistant materials or utilizing protective coatings to mitigate these challenges.
- Q: Geomembrane anti-corrosion?
- HDPE geomembrane is a flexible waterproof material, with a high permeability coefficient (1 × 10-17cm / s); 2, HDPE geomembrane has good heat resistance and cold resistance, 3, HDPE geomembrane has a good chemical stability, can resist strong acid, alkali, oil corrosion is a good anti-corrosion materials; 4, HDPE geomembrane has a very high temperature, high temperature, 5, HDPE geomembrane has a strong weather resistance, a strong anti-aging properties, can be used for a long time to stay and maintain the original use of anti-aging properties, so that it has a high tensile strength to meet the needs of high standards of engineering projects; 6, HDPE geomembrane overall performance, HDPE geomembrane has a strong tensile strength and elongation at break, so that HDPE geomembrane can be used in a variety of harsh geological and climatic conditions. 7, HDPE geomembrane with high quality primary plastic and carbon black particles without any preservatives, HDPE has been used in China to replace PVC as food packaging bags and plastic wrap raw materials.
Send your message to us
Lago Geomembrana High-Density Geomembrane for Environmental Engineering in Potable Water Systems
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords