Good Quality PVC Door Frame TCF220A

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The settlement area of the doors and windows is calculated by what size
They may live on the C-1 actual size, but should be expressed as: 1675x1185. Just 1185 looks like it is a bit small.
Q:Second - hand housing renovation, do not want to decorate, just want to re - brush the wall, paint the door and window frame, which should first brush?
Can ah, if the wall is also complete, then re-latex paint on it. First brush the wall, in the brush window frame, brush the window when you use the protective paper to the surrounding wall will not paint the paint on the wall. The window with sandpaper to the old paint polished clean and then on the new paint is ideal.
Q:EPS line is good or GRC line is good? Villa facade, doors and windows frame.
If it is a private villa that I am responsible to tell you GRC better than the EPS on the grounds that: GRC is made of high-strength cement, glass fiber, steel, sand and sand can be the same life and housing, and EPS is a grid , Interface agent, made of foam, which is a bubble, the outside is a cement slurry. Both grades are not the same.
Q:What color should window frame should be?
Door frame can choose white or shallow champagne broken bridge aluminum, with more fresh. Broken bridge aluminum color is also very rich, any color can choose.
Q:Bathroom, wash basin cabinet door mosaic
I have seen with the blockboard to do the backplane, with adhesive.
Q:What are the key points for the production and installation of wooden doors and windows?
2, the first fixed hinge side, to be close can not have a gap, up and down and left and right vertical, with screws or gun nails fixed; 3, door sets and the door frame pressure can not exceed 0.3mm, the line in the saw 45 ° angle when the corner to be straight, if burr, sandpaper sanding after the fight; 4, after installing the door, check whether the two sides are equal, the door is too large or too small , Some to open and close the page must be the first amount of accurate size, before processing, assembly page when the screw to play straight, lock to be firmly flush; 5, good product protection.
Q:What is the gap between the window and the wall?
First, the mouth is installed when the expansion joints for 15 to 20 mm, the net mouth is installed 10 to 15 mm expansion joints. Second, if the gap is not appropriate can be repaired by the following method 1, the gap between the wall and the window filled with a blowing agent, the outside must use a waterproof sealant to seal the gap between the window and the wall. 2, of course, the premise is that the gap can not be too big The gap is too large, it must first be filled with waterproof mortar smoothing, doors and windows installed fixed, surrounded by windows with a blowing agent to fill, after curing cut, the last outside the border around the inside and outside both sides are playing sealant. 3, if the cracks are not big, then to the market to buy a sealant and simple glue gun, and then do repair work like.
Q:Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The
Step 3: the wall of the demolition; the second step: the transformation of water and electricity; the third step: paving the kitchen bathroom wall; waterproof; tiles fourth step; woodworking approach; fifth step; Six steps; installation, etc. follow-up work
Q:How do I install windows?
Two methods. The One is to get rid of the window. The Changed to open. The Then the shoes inside the window. The Another way is to install stealth Shachuang, installed on the outside of the kind. The
Q:What is the horizontal line? How do I install windows and doors on a horizontal line?
That is, five lines, both vertical and horizontal, the best line

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range