GOLDEN PRINCE CONCRETE MIXER TRUCK, 8CBM, 6X4
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
BRAND OF CHASSIS: GOLDEN PRINCE
CHASSIS MODEL: ZZ5251GJBM3241A1/M Mixer
General Configuration : Golden Prince,290HP,6×4,Europe Ⅱ,8 Meter Cubic
Mass Parameters | Total Weight (kg) | 25000 | |
Volume (Meter Cubic) | 8 | ||
Size Parameters | Overall Dimensions (mm) | Length | 7950 |
Width | 2496 | ||
Height | 3875 | ||
Distance between Axles (mm) | 3200+1350 | ||
Performance Parameters | Max. Driving Speed (km/h) | 75 | |
Economic Speed (km/h) | 60 | ||
Recommended Configuration | Engine | WD615.87 | |
Gearbox | HW15710 | ||
Rear Axle | HC16 | ||
Oil Tank (L) | 300 | ||
Suspension (front/rear spring) | 10/12 | ||
Tire | 12.00-20 |
- Q: How many layers of steel wire tyres are used in concrete mixers
- For example; 1200 the r20 pr M588 18 1200 is the outer circle size R is the radial tire 20 is the inner circle size, Should be 18PR!!!!!! This is the level of the wire in the tyre. M588 is the symbol of tire tire!! Concrete agitator truck tyres are usually used in 18 levels of steel wire tyres, which is used in 20 levels I'm selling tyres, I hope to help you
- Q: Is it possible to mix the concrete in a mixing truck for eight hours?
- When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
- Q: How many years does the concrete agitator truck go away?
- A. wanxiang rotation is part of the fault area. The grease should be added on time, and the wear condition should be checked regularly to repair the replacement. The team should have a spare, versatile shaft assembly to ensure that the work will be restored within a few minutes once the malfunction occurs. B. keep the hydraulic oil clean. It is necessary to prevent the sewage and silt from entering the hydraulic system. Hydraulic oil should be changed regularly according to the manual. Once the water or silt is found in the hydraulic fluid, the hydraulic system and the hydraulic oil are replaced immediately. C. ensure the hydraulic cooling unit is effective. Be sure to clean the hydraulic oil radiator regularly, prevent the radiator from being blocked by cement, check whether the radiator electric fan is running properly and prevent the hydraulic oil from exceeding the temperature. The hydraulic part should be clean only for hydraulic oil, usually not very much. But unlike manufacturers, service life is different
- Q: How did the concrete agitate the concrete
- When pouring into the mixing building, the two sides of the car are equal to the stirring bracket, and the first time the mouth is made a mark, so that the next time it will be successful!
- Q: Does it affect the ease of mixing too long?
- Are now using concrete products, easy to control the quality, intensity can be measured, can also add additive, etc., only their own building the in-situ mixing, transportation for a long time will affect the workability, so the project will adopt water mud and water reducing agent, etc.
- Q: What is the driving license for a concrete mixer truck?
- Fees vary from anywhere from 2,500 to 3,500 Some places can be around 4,000 to 4500 The other thing is to get a certification, but the car on the site is generally unexamined.
- Q: How many cars do you have for a concrete tanker
- What kind of car is there, there are eight square, six square, and more
- Q: What is the purpose of the concrete mixer
- You're not going to give it to you, right?so i do not ansewr you
- Q: Why is the concrete mixer turning on the road?
- Prevent concrete from being isolated and make concrete more uniform. In addition, the concrete is in a state of stagnation for a long time, and the vehicle shakes and the concrete will soon be compacted, and the pot will not move.
- Q: What is the difference between a concrete mixer and a tanker?
- Concrete mixers are also called concrete mixers, and they are called concrete transporters, which are actually a kind of thing What you said may be loaded tanker powder material tank car, is see that pull a big jar of cars on the road, is not only a transportation of concrete so strict said that contains both relations with is included
Send your message to us
GOLDEN PRINCE CONCRETE MIXER TRUCK, 8CBM, 6X4
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords