Garbage Truck 10m3 ISUZU 4X2 (QDZ5120ZYSC)

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description for  10m3 ISUZU 4X2 (QDZ5120ZYSC)

Place of Origin: Shandong, China (Mainland)

Model Number: 10m3 ISUZU 4X2 (QDZ5120ZYSC)

 

Features for 10m3 ISUZU 4X2 (QDZ5120ZYSC)

1. Equiped with special vacuum pump(rating rotate speed=1400r/m,min rotate speed>800r/m, max suction lift>6m, vacuum>500mmHg, clockwise).

2.Equiped with power take off, transmission shaft, high pressure sewage tank, pipe network, sewage pipe for observing and cleanout equipment.

3. The sewage tank is sealed well and tanks back cover can be opened.Tank dirt dumped directly through the back cover, with a high vacuum (larger) than fecal suction truck

 

 

Specification for  10m3 ISUZU 4X2 (QDZ5120ZYSC)

Garbage Truck 10m3 ISUZU 4X2 (QDZ5120ZYSC)

 

 

Pictures for 10m3 ISUZU 4X2 (QDZ5120ZYSC)

 

 

Garbage Truck 10m3 ISUZU 4X2 (QDZ5120ZYSC)

 

Garbage Truck 10m3 ISUZU 4X2 (QDZ5120ZYSC)

 

 

 

MOQ for  10m3 ISUZU 4X2 (QDZ5120ZYSC)

Q:What is the function of garbage truck:
A:
This  truck is mainly used to suck, transport, unload, and load sewage and sludge existing in the sewer lines and rainwater wells, and it can also be used to suck and transport wastewater, industrial waste oil, and sewage in large factories. Furthermore, sometimes it can even be used to dredge and clean small watercourses.
It is mainly composed of chassis, tank, hydraulic system, high-pressure system, and electrical system.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What can be done to remove the concrete from the concrete mixer truck
The shovel shovel Conditional to buy a pneumatic spatula knife, only to find in the area of material removal lon-izing dozen, can a small amount of hydrochloric acid or outside the shovel shovel shovel, car or flushing timely, keep clean can adhere to, once the dirty is not in the mood in the lane
Q:Does it affect the ease of mixing too long?
The site stirring, the quality is not easy to control, the site pollution is serious for the main reason, the construction committee has the file request, so all do not stir in the scene.
Q:How does the concrete mixing truck work?
Operating mechanism (1) control the rotating direction of the mixing cylinder so that it is rotating in the process of feeding and transportation. (2) control the speed of the mixer. The mixing device consists mainly of the mixer and its auxiliary supporting parts. Mixing drum of concrete loaded containers, rotates the concrete along the blade spiral direction, constantly in the process of ascension and turning by mixing and stirring. In the process of feeding and transportation, the mixing cylinder is turning, the concrete is moving in the blade, and the mixing cylinder is turned and the concrete is removed out of the blade. The blades are the main parts of the mixing plant, and the damage or severe wear and tear can cause the concrete to be mixed. In addition, if the design is unreasonable, the concrete will be isolated
Q:Is it possible to mix the concrete in a mixing truck for eight hours?
When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
Q:The concrete mixer transporter is running continuously for no more than one hour
The concrete mixer transporter is running for no more than 8 hours. Concrete mixing is divided into two kinds: artificial mixing and mechanical stirring Manual stirring search When stirring, try to be quick, stirring time from adding water, should meet the following rules in general: The volume of the mixture is 4 ~ 5min (minute) under 30L. The volume of the mixture is 30L - 50L at 5-9min The volume of the mixture is 51L - 75L at 9 ~ 12min After mixing, it is required to do the slump measurement or the specimen forming according to the test requirement. The total operation must be completed in 30min from the beginning of the addition of water.Mechanical agitation First, it is the first batch, which is to make the ripper first, so as not to affect the mixing ratio of the mix. Start the mixer, blender, in turn, to join the gravel, sand and cement, stir evenly, add the water slowly again, all charging time not more than 2 min, water after all to join, to continue mixing 2 min.
Q:What is the normal speed in the transportation of the concrete mixer
In the case of idle speed (engine speed of 600 r/min) generally feed mixing every 4 r/min, when discharging at around 6 r/min, the gas engine speed from 1500 to 2000 r/min when the hydraulic pump and motor mechanical efficiency is highest, feed mixing around 10 r/min, when discharging 12 to 14 r/min. Speed is adjustable, through adjust the driving torque of each point, can make the speed increase or decrease, when the stirring speed too fast will affect the service life of the hydraulic system, general stirring speed in the process of transportation for the 3 revolutions per minute.
Q:What is the purpose of the concrete mixer
It is the delivery of concrete!!! During the shipment, the tank continuously rotates and prevents concrete from solidifying. Once delivered, the concrete can be poured into the pump to get the concrete where it needs to be.
Q:s the collapse of four concrete mixer trucks
The caving degree is 4 cannot be transported by concrete mixer, the slump is put into and out of the tank car. The average slump is 100 to 120mm, and it is better not to transport the concrete transporter, preferably with a construction dump truck.
Q:What is the car for concrete
Concrete cars are called concrete mixers (concrete cars), which are used for transporting concrete concrete trucks for construction purposes. Because of its appearance, it is also commonly referred to as the tian.
Q:What is the meaning of the word "concrete" in the concrete mixer jar?
In a large number of academic articles, the use of "concrete" is frequently used. In an academic seminar, the concrete was officially replaced with concrete. The "concrete" reads "TONG". Bituminous concrete meaning of commercial concrete, certain mixing station at the time of order mixers to manufacturers on their own brand, for instance the mixers in dacheng mixing station tanks on "dacheng bituminous concrete. If it is a part of nanjing city, it can also be printed on the tank. This is not a very demanding, different person.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range