• German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler System 1
  • German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler System 2
  • German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler System 3
German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Standard:
EN74-1:2005 BB
Grade:
8.8
Surface:
Electro-galvanized/HDG
Type:
German Type
T-Bolt:
M14-86mm
Weight:
1.45kg/pc
Size:
48.3*48.3mm
Flange Nut:
22mm

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler


1. Product Detail:

Size

48.3*48.3mm

Weight1.45kg/pc
T-BoltM14-86mm
Flange Nut22mm
SurfaceElectro-galvanized/HDG


2. Company Introduction

        We are a professional manufacturer of scaffolding couplers and scaffolding accessores, there are 4 forging lines in our workshop and we have our own mould machines and technicians , could meet different requests from clients. OEM also available.  All our products are made according to international standard EN74-1:2005/BS1139 and AS1576.2-2009 and we own the test machine in our factory to control the quality.

        Welcome to our factory anytime you want.


Factory View:

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler


German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler


Product Details:

A. BS Type Double Coupler and Swivel Coupler 

B. German Type Double Coupler and Swivel Coupler 

C. US Type Double Coupler and Swivel Coupler

D. Italian Type Double Coupler and Swivel Coupler

E. Putlog Coupler/Single Coupler

F.  Board Retaining Coupler

G. Fixed Beam Clamp

H. Swivel Girder Coupler

I.   Sleeve Coupler

J.  Bone Joint

K. Jack Nut

L.  Forged Wing Nut and so on.......


Pictures of German Type Swivel Coupler/Scaffolding Pipe Fittings

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler



Remarks:

1. Packing: Woven bags+steel pallet or other shipping standard

2. Leading time: Reguarly 25-30 days after receving advanced payment or according to your qty.

3. Payment Term: 30% advanced payment by T/T, 70% balance against copy of BL .


Packing Picture:

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler

German Type Drop Forged Scaffolding Pipe Fittings Swivel Coupler


For more informaiton, please keep in touch with Bella.

Hope to work with you together in the near future.

Thanks .






Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:i just need to know the age limit with parental permission?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:What's an antonym for the word scaffold?
I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
Q:Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Fastener type steel pipe scaffold accessories
Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
(3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords