Formwork butterfly wing nut 6

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:
Dia90mm,100mm,110mm

Packaging & Delivery

Packaging Detail:Pallets, or crates, or bags
Delivery Detail:20 DAYS

Specifications

Material:iron&steel
Surface:Galvanized
Colour: White, Yellow
Quality Level: High Quality
Offer OEM service

Formwork Accessory

Name:wing nut


Material:iron&stee

l

Surface:Galvanized


Tensible strength:more than 200KN


Colour:white yellow


Weight:0.12kg-1.41kg


Quality Level:high quality


Meet custom requirements


Offer OEM service


wing nut

why should you choose us?


1.We are the biggest and most efficient manufacturer and world wide exporter of formwork and scaffolding accessories in China.



2.We have more than ten years manufacturing and exporting experience of formwork and scaffolding accessories.



3.We have extensive and comprehensive quality control system recognised world wide.



4.Your job will be in good hands as we have all round experienced staff in all our departments.



5.Our prices are very much competitive and open to negotiation.

We have the professional technology and more than ten years experience, also have the powerful manufacturing capacity and excellent quality control, equipping with the advanced Electric Furnaces, Chemical Analysis Monitors, Core Making Machine Lines, Heat Treatment Line, and also have the Tensile strength tester, Chemical analysis equipment, Metallographic equipments and so on. So our products have the excellent Tensile Strength and Elongation, the best Chemical Composition and the high-quality Appearance.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Construction scaffolding fastener weight?
Weight: 48kg above 3, single piece weight in 20Kg or so, easy to carry and construction operation. 4, the installation and removal of only bare handed, greatly improved the efficiency of the door scaffolding installed than the fastener steel tube fast 1/2 time, faster than bamboo scaffolding 2/3 time. 2 the maximum weight of a single piece is not more than 20 kg, so lifting, assembling and disassembling and transportation are convenient
Q:What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(1) main componentComponent for forming the main body of a scaffold. The vertical rod and the top rod are respectively provided with two kinds of specifications, and both sides of the rod are welded with a lower bowl buckle with a spacing of 600mm. If the vertical rod and the ejector rod are matched with each other for long use, the utility model can form an arbitrary height scaffold. Take a long pole, the joints should be staggered, the top layer and then leveling rod length two.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:How much more painful is the scaffold/industrial piercing opposed to a normal cartilage piercing?
once you get it pierced do no longer stressful up bc its going to harm like 10 situations extra. stay comfortable and actual do now not sleep on it in view which you will awaken day after today with a swollen ear and in discomfort. sparkling it thrice an afternoon for 12 weeks. And basically a reminder cartilage piercings do take a together as to heal. Mine took a pair of 365 days in a a million/2 to absolutely heal. meaning the place i became into waiting to sleep on it and not harm.the place i became into waiting to pass it around without it getting contaminated minutes later. you may haven't any problem with it as long as you're looking after it =) And from a a million to 10 i say its between a 7 and eight once you get it pierced bc it does throb after.
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:How to solve the problem of scaffold pipe repair
Easy to move, straightening, derusting, ash removal, painting can be completed on the same machine at the same time, labor saving, labor-saving, easy to operate, can be adjusted 48mm Phi - Phi 51mm of all types of steel pipe
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!
Q:Can you do the outer scaffolding?
(4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range