Formwork butterfly wing nut 5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: |
Packaging & Delivery
Packaging Detail: | Pallets, or crates, or bags |
Delivery Detail: | 20 DAYS |
Specifications
Material:iron&steel
Surface:Galvanized
Colour: White, Yellow
Quality Level: High Quality
Offer OEM service
Formwork Accessory
Name:wing nut
Material:iron&stee
l
Surface:Galvanized
Tensible strength:more than 200KN
Colour:white yellow
Weight:0.12kg-1.41kg
Quality Level:high quality
Meet custom requirements
Offer OEM service
wing nut
why should you choose us?
1.We are the biggest and most efficient manufacturer and world wide exporter of formwork and scaffolding accessories in China.
2.We have more than ten years manufacturing and exporting experience of formwork and scaffolding accessories.
3.We have extensive and comprehensive quality control system recognised world wide.
4.Your job will be in good hands as we have all round experienced staff in all our departments.
5.Our prices are very much competitive and open to negotiation.
We have the professional technology and more than ten years experience, also have the powerful manufacturing capacity and excellent quality control, equipping with the advanced Electric Furnaces, Chemical Analysis Monitors, Core Making Machine Lines, Heat Treatment Line, and also have the Tensile strength tester, Chemical analysis equipment, Metallographic equipments and so on. So our products have the excellent Tensile Strength and Elongation, the best Chemical Composition and the high-quality Appearance.
- Q: How to calculate the fastener type steel pipe scaffold
- 1 "Uniform provisions" on the scaffolding structure design calculation method?1.1 requirements for design methods and design requirements1.1.1 stipulates that the scaffolding structure will be based on the probability theory based on the limit state design method (referred to as the probability limit state design method, that is currently China's engineering structure design method) for design.
- Q: How to calculate the rental price of portal scaffolding
- Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
- Q: How to set up the temporary structure of the external structure of the balcony on the two structure
- Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.
- Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
- Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: What's the film where gene Kelly dances on scaffolding? And at a gym?
- I think it's Living in a Big Way.... I could be wrong...
- Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
- Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
- Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
- Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
- Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- no its sixteen interior the united kingdom for any variety of ear piercing sixteen with out parent permssion and it will harm rather undesirable take a protracted time to heal and it will value approximately ?35-?40 and clean it with salt water.
- Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
- it looks awesome just make sure you keep it under clean conditions, once it gets inflammed it is SUPER painful and dangerous
- Q: Fastener type steel pipe scaffold composed of which components?
- Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Send your message to us
Formwork butterfly wing nut 5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords