• Cuplock Scaffold System with Top Quality Factory Supply CNBM System 1
  • Cuplock Scaffold System with Top Quality Factory Supply CNBM System 2
  • Cuplock Scaffold System with Top Quality Factory Supply CNBM System 3
Cuplock Scaffold System with Top Quality Factory Supply CNBM

Cuplock Scaffold System with Top Quality Factory Supply CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Cuplock Scaffold System with Top Quality Factory Supply  

  • Type: Heavy Section Steel

  • Forming: Welding Products

  • Standard:GB, ASTM, DIN, JIS, AISI, BS, En74,Bs1139

  • Member:Steel Column

  • Trademark:Quality Carbon Structural Steel and Alloy Structural Steel

  • Connection Form:Welded Connection

  • Carbon Structural Steel:Q235,Q255,Q345

  • Residential Wall Structure:Wall Support

  • Type of Steel For Building Structure:High-Strength Steel

  • Bs1139, En74 Standard:Tube :48.3mmx3.25mm/2.5mm

  • Export Markets:Global



  • Cuplock Scaffold System with Top Quality Factory Supply CNBM

  • Cuplock Scaffold System with Top Quality Factory Supply CNBM


  • Cuplock Scaffold System with Top Quality Factory Supply CNBM

Descriptions of Cuplock Scaffold System with Top Quality Factory Supply 

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of Cuplock Scaffold System with Top Quality Factory Supply 

Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.

  • The Main Components of Cuplock Scaffold System with Top Quality Factory Supply 

  • Verticals

  • Description

    Material

    kg/pc

    Article No.

    9'10" Vertical 3.00m

    Q345 φ48.3×3.2

    16.90

    SC1001 3000

    8'2" Vertical 2.50m

    Q345 φ48.3×3.2

    14.20

    SC1001 2500

    6'6" Vertical 2.00m

    Q345 φ48.3×3.2

    11.60

    SC1001 2000

    4'11" Vertical 1.50m

    Q345 φ48.3×3.2

    8.90

    SC1001 1500

    3'3" Vertical 1.00m

    Q345 φ48.3×3.2

    6.20

    SC1001 1000

    1' Vertical 0.50m

    Q345 φ48.3×3.2

    3.50

    SC1001 0500

Horizontals

  • Description

    Material

    kg/pc

    Article No.

    10'0" Horizontal 3.05m

    Q345 φ48.3×3.2

    11.80

    SC1002 3048

    9'0" Horizontal 2.74m

    Q345 φ48.3×3.2

    10.70

    SC1002 2743

    8'2" Horizontal 2.50m

    Q345 φ48.3×3.2

    9.80

    SC1002 2500

    7'0" Horizontal 2.13m

    Q345 φ48.3×3.2

    8.40

    SC1002 2133

    6'6" Horizontal 2.00m

    Q345 φ48.3×3.2

    7.90

    SC1002 2000

    6'0" Horizontal 1.83m

    Q345 φ48.3×3.2

    7.20

    SC1002 1828

    5'11" Horizontal 1.80m

    Q345 φ48.3×3.2

    7.10

    SC1002 1800

    5'0" Horizontal 1.52m

    Q345 φ48.3×3.2

    6.10

    SC1002 1524

    4'11" Horizontal 1.50m

    Q345 φ48.3×3.2

    6.00

    SC1002 1500

    4'1" Horizontal 1.25m

    Q345 φ48.3×3.2

    5.00

    SC1002 1250

    4'0" Horizontal 1.22m

    Q345 φ48.3×3.2

    4.90

    SC1002 1219

    3'6" Horizontal 1.07m

    Q345 φ48.3×3.2

    4.30

    SC1002 1067

    3'3" Horizontal 1.00m

    Q345 φ48.3×3.2

    4.10

    SC1002 1000

    3'0" Horizontal 0.91m

    Q345 φ48.3×3.2

    3.80

    SC1002 0914

    2'11" Horizontal 0.90m

    Q345 φ48.3×3.2

    3.70

    SC1002 0900

    8'0" Horizontal 2.44m

    Q345 φ48.3×3.2

    9.50

    SC1002 2438

    1'10" Horizontal 0.57m

    Q345 φ48.3×3.2

    2.40

    SC1002 0600

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:i need as much detail you can give me on these symbols in the book scarlet letter by Nathaniel Hawthorne. if you have any website references besides cliffs notes and spark notes i would greatly appreciate it!!!
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:Cantilever scaffold technical disclosure
Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
Q:Because my friend wants it done but isn't sure :)
depends on the state.
Q:Can you do the outer scaffolding?
6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
Industrial piercings take 9-12 months to heal completely and you never want to remove an unhealed piercing unless the jewelry is causing problems and at that point it should be done by a professional in a sterile environment. Taking the jewelry out before it is healed could cause it to close up, become infected or irritated, and can cause hypertrophic scarring (scar tissue) to form on your piercing. I took my industrial out after having it for 3 months. It was out for less than a minute and when I went to put it back in it went through the first hole easily but wouldn't go through the top hole no matter how hard I pushed. It immediately started bleeding and hurtling like crazy. Awesome. Waste of time, pain, and money. So, you might get lucky and just have it get a little irritated or prolong the healing time by changing it early. But you could also end up like me or worse, with any infected piercing. Why risk it?
Q:I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price
Q:What are the requirements for the sampling inspection of scaffolding?
Quality specification for the cantilever support1 the material of the suspension bearing frame should have the certificate of quality and quality inspection report;2 the height and length of the weld shall meet the design requirements, and shall not have any defects such as welding cracks, structural deformation, corrosion and so on;3 the production quality of the suspension frame shall be in conformity with the provisions of appendix D table D.1.
Q:I couldn't believe it, but yes it happened...
Yes I can. Did you hear about that drunk guy who survived a 17 story hotel fall. I think he ended up having a broken foot.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords