Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7034 Description:
1.CMAX Tower Crane TC7034 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7034 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7034 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7034 Parameter:
Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 3.4
Tower Crane TC7034 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7034 Diagram:
Tower Crane TC7034 Technical Sheet:
Tower Crane TC7034 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- www.okorder /
- Q: I have skills in my craft, I need finatial help for a n.c.c.c.o. certifacation.
- Without okorder /
- Q: What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
- In Sydney Australia a tower crane operator makes a little over $2000 a week after tax on average. Pay is about $40 to $50ph, alot of allowances + penalty rates. Expect to work big hours for the money though. To become an operator go to your local union office, they might point you in the right direction for your region.
- Q: the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
- So I can't tell whether the cargo container is one ton (2000 lbs.) or ten tons (20,000 lbs.). For doing the problem, I'm using 2000 lbs., so you might have to multiply the answers by 10. Also, I'll use A and B for the cranes instead of I and II. (Vertical): A sin 30° + B sin 45° = 2000 == A + √2 B = 4000 (Horizontal): -A cos 30° + B cos 45° = 0 == -√3 A + √2 B = 0 Solve those equations simultaneously to get A = 4000/(1+√3) = 1464 lbs. and B = √(3/2) A = 1793 lbs. (Answers) The vectors are: A = 1464 (-i cos 30° + j sin 30° = -1268i + 732j (Answer) B = 1793 (i cos 45°i + j sin 45°) = 1268i + 1268j (Answer)
- Q: My science teacher wants to know why cranes make work easier rather than just lifting an object yourself. She refers to the formula of force x distance. So i have to compare (in a way) the work of a human lifting an object and a crane lifting an object. Grrrr.... I hate this project!
- The type of crane she is referring to ia a simple pole with a fulcrum placed between the person operating the crane, and the mass to be lifted. Imagine a weightless pole with a rope tied to one end attached to a mass of weight 224 lbs The pole is 9 feet long Let's say the human weighs 112 lbs, or half of what is to be lifted. Without a crane, it will be difficult to lift that much and swing it around. With the crane, though, let's look at the advantage when a fulcrum is placed under the pole and the person pushes down on the pole to lift the weight. First, note that gravity is in favor of the person to use their weight on the pole. Using physics, with the fulcrum place at x from the mass to be lifted, the downward force of the person is F*(9-x)=224*x or F=224*x/(9-x) now plug in some values for x and compute the force: x F 4.5 224 3.5 143 2.5 86 1.5 45 0.5 13 I started by placing the fulcrum exactly in the middle and then moving the fulcrum in increments of 1 foot closer to the weight to be lifted Notice that the more pole towards the person pressing down, the less force the person has to apply to lift the weight. Also, note that when the fulcrum is in the middle, the person must apply a downward force equal to the weight - which willl be difficult foir a person that weighs 112lbs. However, once the fulcrum is placed 2.5 ft from the weight, the person only need apply 86 lbs of downward pressure. Leverage. j
- Q: Tower crane and construction hoist service life? What are the norms and standards? How to detect?
- more than 1250KN.m (including 1250KN.m), the factory more than 20 years of age (including 20 years);Construction hoist: SC years of construction for more than 8 years (excluding 8 years) SS construction hoist; factory life of more than 5 years (excluding 5 years) of the construction hoist.Excluding other areas
- Q: So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
- You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
- Q: For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
- you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
- Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
- Hey Adam, Hmmm....not too sure about that one. But give this a shot. Check the threaded inserts in the coils (screw terminals), I have seen them break loose PLEASE tell me you are NOT running in race mode!!!.....Street bike run MUCH MUCH better with a VOES....adjust the VOES to 6 of vacuum...email if you don't know how to adjust them, it seems to be a little known fact to almost everyone that they ARE adjustable. Check the connections to the voes also. Reset set the static timing....set the TDC mark in line with front of the timing hole, this will be at 32 degrees, EVO's and TC's run better SLIGHTLY retarded. I would also throw on a fresh set of CARBON CORE plug wires. The Cranes don't seem to like Taylor style (spiral wound) wires. Check to see how it runs. Then try switching back to single spark and see what happens. If nothing changes, I am not too sure what it could be, other than the coil itself, without being able to see it first hand. If you do figure it out, let me know what you found.
- Q: What is the wall radius of a qtz50 tower crane?
- The working radius is usually 50 meters. There are also 48, 49 meters. For example, 4810, 4910, and 5010, belong to 50 tons of tower cranes.Qtz50 resolves to:Q: crane;T: Tower type;Z: Jack up;50: lifting torque of 50 tons meters.
Send your message to us
Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords