Casting steel support nut 1

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Packaging & Delivery

Packaging Detail:packded in pallet of in bulk
Delivery Detail:within 20 days

Specifications

adjustable support jack
1.Q235
2.galvanized / paint
3.hollow & solid
4.adjustable

Our Services

Custom direct manufacturer scaffolding fitting & supporting system scaffolding nut handle

Our advantages:

1. Globally acceptabe quality: The products offered by us are thoroughly examined by our experienced professionals to ensure their durability, reliability and long service life. (ISO 9001)

2. Competitive price: direct manufacturer, reducing all unnecessary cost for you.

3. Professional team:20 years foreign customers service experience. Over 10 years investment casting manufacture. Almost 35% high educated people.

4.Good service: Customer is god.

the packing & shipment:

1.sample is for free, and the freight is negotiated.

2. Payment: T/T, L/C, credit card, western union, or acc to requirement(30% T/T in        advance,and 70% after seeing the B/L)

3. Package: Crate or as your requirement

4. Shipping: Air, boat, truck, TNT, DHL, etc.(as per the actual situation)



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specification and type of scaffold erection
2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
Bowl buckle scaffold is a new type of steel scaffolding. The original scaffold with tooth bowl joints, with spelling and rapid, saving, stable and reliable structure, fully equipped, strong versatility, large bearing capacity, safe and reliable, easy processing, easy loss, easy to manage, easy transportation, wide application etc.. Has received several awards at home and abroad, is one of the ten key technologies to promote the Ministry of construction in 2000.
Q:Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q:How to maintain the scaffold after use
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q:What's an antonym for the word scaffold?
I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
Q:Latch type disc scaffolding accessories are national patent products?
The utility model is mainly used for a light frame and a background frame of a large-scale concert Pankou, type multifunctional scaffold, the scaffold socket diameter of 133mm and thickness of 10mm disc, 8 hole disc, adopting 48*3.2mm, Q345A pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disk. The bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Which accessories are included in a movable scaffold
Chinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, buckle disc scaffolding, socket type steel pipe scaffolding, scaffolding, ladder scaffolding, and every kind of the scaffolding, hanging scaffold and the scaffold steel pipe materials.
Q:A painter is standing on a scaffold raising at a constant speed. He pushes a can over at 15.00 meters.?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt² 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s²)(3.25 s)² vo = +20.5 m/s

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range