Casting Ledger End,Brace End

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Type:
Scaffolding Parts
Scaffolding Part Type:
Ringlock parts
Product:
Ringlock parts
Parts 1:
Ledger end
Parts 2:
Brace end
Parts 3:
Pin
Surface:
Black,Electric galvanized, Hot dip galvanized
Packing:
Big woven bags
Delivery:
15-25 days

Packaging & Delivery

Packaging Detail:Big woven bags or woden case
Delivery Detail:15-25days

Specifications

Scaffolding ringlock parts-Ledger end
1. Casting Ledger end
2. For 48mm steel tube

Product Description

Product name    

Ringlock Parts-Ledger End

Material

Castiing steel

Weight

0.32kg/0.375kg/0.435kg/0.50kg/0.51kg/0.54kg

Surface

Black or Galvanized

Size

For 48mm steel tube

Other size

As your drawings

Main Business:

1. System scaffolding:

Include: Kwikstage system scaffolding and accessories; Ringlock system scaffolding and accessories; Cuplock system scaffolding and accessories; Haki system scaffolding and accessories.

2. Couplers/Clamps:

We can manufacture all kinds of drop forged or pressed couplers, include: British type couplers, Italian type couplers, German type couplers, American type couplers, and many other kinds of couplers as per your drawings.

3. Frames

Mainly include: Mason (Ladder type) frames and walk through (door type) frames, we can also manufacture as per your drawings.

4. Shoring Props

Quality shoring props of different specifications can be manufactured in our factory.

5. Planks/ Toe Board:

Both aluminum and steel planks can be manufactured in our factory.

6. Others

We can also manufacture casting parts, fences, ladders, steel trays/stillages and other related products that are needed in the erection of scaffolding.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:Find the demolishing scheme of scaffold
Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
Q:Want to rent the scaffolding in the county, you need to cast how much money
A portal scaffolding about 200, a steel springboard around 50,
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Division.. Scaffold method?!?
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:Cantilever scaffold technical disclosure
First, the foot of the structure of the quality standards:1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:Can you do the outer scaffolding?
(2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range