Auto Welded Steel Ringlock System Scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Auto Welded Steel Ringlock System Scaffolding
Scaffolding System
Ringlock Scaffold
Steel Q235, Q345
48.3*3.25mm, etc
Hot Dipped Galvnazied/Painted/Powder Coated
Automatic Welding, Punching, Casting, etc
Standard, base collar, ledger, diagonal brace, etc
Inside/Outside Building, Bridge, Platforms, etc.
OEM is Available

Packaging & Delivery

Packaging Detail:as the requirment of clients
Delivery Detail:20days


Auto Welded Steel Ringlock System Scaffolding
Material: Steel Q235/Q345

Product Description  

Name:  Auto Welded Steel Ringlock System Scaffolding

Category: Scaffolding system

Material: Steel (Q235/Q345)

Size: D48.3*3.25MM

Surface: Electro Galvanized/Self Color/Painted/HDG

Component: Standard, Ledger, Angle Iron ledger, Diagonal, Bracket, Holder, Support, Edge Banding, Board Holder, base jack, U head Jack, etc.

Application: Slab support,staircase,stage platforms,bridge support,mobile tower etc.

Advantage: Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle

OEM service is available

Items or goods can be manufactured according to your standards

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Among them, the proportion of steel pipe fastener scaffold is larger, and the door type scaffold is mainly used for decoration and indoor construction
Q:How much is a bowl buckle scaffold
According to the current market situation, it is necessary to tens of dollars a cube
Q:What are the main types of bowl buckle scaffold
The main load is the weight of people, and some building materials tools, etc.
Q:Would you get on a window washer scaffold on a skyscraper for $1000 ?
Hell yeah! But it would be madd scary.
Q:Scaffolding construction specification is what? Do you know?
Load requirements of the scaffolding: masonry works per square meter 2700N, decorative works per square meter 2000N, scaffolding per square meter 2500N,Scaffolding scaffolding per square meter 1000N, special circumstances to be determined by calculation.4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, pay attention to not allow foot hand eye parts: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick the wall brick lintel and a beam into a 60 degree angle of the triangle, windows and doors on both sides of brick and 1 3/4
Q:Cuplock scaffolding every 6 meters set a longitudinal scissors is what mean
The utility model also needs to be provided with a scissors support, which aims to ensure the stability of the frame body, avoid the appearance of the slope, improve the safety of the construction, and avoid the occurrence of safety accidents
Q:Which is faster and more convenient for the construction of the scaffold and bowl buckle scaffold
Because of the new type of scaffold scaffold products compared with other varieties of the country has not yet introduced the corresponding implementation of the standard, but with the improvement of market acceptance of the national department will introduce the corresponding standards.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:Does getting a Scaffold Piercing hurt?
I just got mine done last weekend, I wont lie its worse then a regular lobe piercing but every body reacts differently. The second hole definitely hurts worse then the first, but for me after the fact mine didn't hurt at all, some people say it throbs or burns but mine never did any of that. Good luck :)
Q:my scaffold piercing wont stop bleeding, really scared, please help?
go see a doctor, that doesn't sound good.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range