60kg Petrol Tamping Rammer with Robin EH09
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Units pc
- Supply Capability:
- 100 Units per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Detailed Product Description
1. Petrol Tamping Rammer
2. Two Stage Air Cleaner
3. Germany polyurethane bellow
4. Operation Weight 60kg
5. CE Certificate
Model | CT-60P-2A-RS |
Engine Type | Robin EH09,Petrol |
Power kw (hp) | 2.0(3.0) |
Weight kg (lb) | 60(132) |
Impact Force kN | 9.8 |
Jumping Stroke mm(in) | 50-70(2-2.75) |
Fuel Tank L | 2.0 |
Shoe size mm(in) | 300×250 (12×10) |
- Q: Gasoline rammer return pipe leakage is going on
- More than 90% of the oil spill is caused by corrosion of the oil seal. Especially for cars over three years. Because the rubber seal for long time due to temperature change will affect the loss of altemately plasticizer, consequence seal shrinkage and hard elasticity, serious and even rupture (this is far not yet reached, when the oil spill will be found if maintenance), oil spill problem can not be avoided.
- Q: Should the foundation be compacted by tamping machine?
- Yes, but should meet the design requirements of compaction requirements
- Q: What materials need to tamper
- It refers to the use of tamping tamping compaction.For example, when you build a house, you have to dig the ground first.
- Q: Do not pull a gasoline rammer
- You see, your description has been seen, but did not see your description of the problem.
- Q: The slope, there is a tamper budget, is the ramming area is how calculated?Because is the rammer labor costs so much to calculate the consolidation area altogetherIn particular, the area needed to fill the slope (I would like to know what the area is) rather than the entire surface area
- No matter how many layers, the floor area of the ground surface is constant, so the area required by the ground surface is calculated.
- Q: Carburetor gasoline leak automatic ramming machine
- The oil needle on the carburetor float doesn't seal properly. Just open it and clean it
- Q: The story of a ramming machine on the trip what's wrong.
- if not reverse switch it is likely that the motor wiring short circuit, short circuit, open space is too small to use multimeter to measure the resistance of a motor.
- Q: Vertical rammer oil spill happened
- softening agent, the hard problem of corrosion, first oil leakage, slowly dripping phenomenon, a long time sealing ring fracture
- Q: What should be noted in the operation ramming machine construction?
- (1) check the insulation circuit, electric leakage protector, directional switch, belt and eccentric block before the use of the tamper, and confirm that no problem can be used.(2) when the tamping machine is operated, two people should operate: one man lifting machine, one person arranging the line to prevent the tamping head from ramming the power cord.(3) when tamping machines turn the corner, they should not turn or throw them freely, or let them walk freely.
- Q: Three-phase electric rammer or two-phase power
- Still use three-phase electricity, turn the distance is big, power is sufficient.Three phase motor and single-phase motor principle is basically the same, are electromagnetic principles of application.
We focus on development, design, manufacture, sales, after-sales service and so on, to supply premium products to our customers. We would like to supply competitive cost and premium quality products to our customers. So, if you have any question or requirement, please feel free to contact us at anytime. We will reply you at first time.
.
1. Manufacturer Overview
Location | Beijing, China |
Year Established | 2001 |
Annual Output Value | |
Main Markets | South America Eastern Europe Southeast Asia Mid East Western Europe Southern Europe South Asia |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered |
Product Price Range |
Send your message to us
60kg Petrol Tamping Rammer with Robin EH09
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 20 Units pc
- Supply Capability:
- 100 Units per Month pc/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords