0.5mm HDPE Geomembrane for Road Construction

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
5000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

HDPE Geomembrane, Find Details about HDPE Geomembrane and Make an Inquiry for Geomembrane at OKorder.com.

1. HDPE Geomembrane Specifications  

1) Thickness : 0.15mm - 4.0mm.

2) Width : Within 8 m (1m-8m).

3) Length : 50m-100m/roll (as request).

4) Material : HDPE,( LDPE, LLDPE, PVC, EVA, etc ).

5) Color : Black , white , red , blue , or as required.

6) Optional surface : Textued(one or two side) or smooth surface.

7) Certificate:CE/ISO9001,14001

2. HDPE Geomenbrane Features  

Good mechanical properties, high tear strength, deformation and adaptable, puncture resistance, anti-aging, anti-ultraviolet-resistant, Anti oil and salt, pH, anti-corrosion, high temperature-resistant, non-toxic, long service life. water, drainage, seepage, the good effect of moisture, width, thickness of the full range of specifications and low cost, simple construction.

3. HDPE Geomembrane Applications  

1) Environmental protection, sanitation (such as solid waste landfills, sewage treatment plants, power plants Chi-conditioning, industrial, hospital solid waste, etc.) .

2) Water (such as rivers, lakes and reservoirs of the anti-dam, plugging, reinforcement of the canal seepage, the vertical wall of the heart, slope protection, etc.).

3) Municipal Engineering (subway, on the ground floor of the building, planted roof, the roof garden of anti-seepage, sewage pipes lining, etc.).

4) Landscape (man-made lake, river, reservoir, golf courses reservoirs of the substrate, slope protection, green lawn of the waterproof moisture, etc.).

5) Petrochemical (chemical plants, oil refineries, gas storage tanks of the anti-chemical reaction tanks, sedimentation tanks of the lining, etc.).

6) Mining (washing and pool heap leaching, the ash-field, dissolved, precipitation, the yard, the tailings seepage substrates, etc.) .

4. HDPE Geomembrane Show

0.5mm HDPE Geomembrane for Road Construction

0.5mm HDPE Geomembrane for Road Construction

0.5mm HDPE Geomembrane for Road Construction

0.5mm HDPE Geomembrane for Road Construction


HDPE Geomembrane RFQ:

1. What are we supplying?

We are specialized in producing .geotextile , geocell, geogrid, geomembrane

2. How Many years experience do we have?
We have been exported to more than 15 countries in the past 10 years.

3. How long do we usually reply your request?

We always reply our customer within 12 hours.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which is better between electric hot plate and electrothermal film?
It depends on actual situation, which can not be directly determined which one is good. The electrothermal film is a kind of exothermic material made of special conductive macromolecule material matched with metal current-carrying strip, hot melted between the insulating film bodies, which will produce heat after being electrified Mainly used for heating element. The electric hot plate is equippment taking electric heating alloy wire as heating material, and mica soft board as insulating material, and wrapping thin metal plate (aluminum plate, stainless steel plate, etc) in the surface for heating. Typical applications like electric hot water bottles. Casting metal tubular electric heating element in aluminum plate/aluminum plate or welding or inlaying on the aluminum plate/aluminum plate to form electrical heating plate of all shapes. Typical application like electric cookers, electric irons, electric coffee makers, etc.. ! ~
Q:can the national standard quality of composite geo-membrane be used for geotextile?
There is a common qualification used by composite geomembrane and geotextile.
Q:What static eliminator is the best for large production equipment of geomembrane?
3024-L remote static eliminator is the best. The highest working voltage of the production equipment can reach 180KV. Otherwise, the quality of the products will decline seriously. So it is of great importance to eliminate static which can avoid the interference to production. At the place for reeling after dividing and cutting in the production equipment, the voltage of static electricity can reach 10KV which can be reduced by this eliminator.
Q:What are the main usages and applications of high density polyethylene film (HDPE) in refuse landfill?
At the same time it can be used for the middle cover, fly eradication and deodorization. HDPE geomembrane is the core of urban household refuse landfill anti-seepage materials.
Q:Does htc phone need to stick film?
There is no brand requirement for film. It only depends on personal preference. If you do not worry about that the screen will be scratched, you need not to stick film, then the display effect will be better. Now people generally choose to stick film for their phones out of protection. Whether to choose high-permeability film or frosted film depends on personal choice. High-permeability film is easy to have fingerprints. But the dispaly effect of frosted film won't be worse.
Q:What are the characteristics of the three layers of protective film of PET film?
Characteristics of three layers of protective film of PET film: 1. It can effectively prevent abrasion and scratch on the screen of notebook computer; 2, Anti-static surface prevents accumulation of dust with strong antifouling performance, and it can be wiped by a soft cloth; 3, Direct contact is not easy to leave fingerprints; 4, Special resistance to radiation, reflection and glare, eliminating 98% of ambient light reflection, and it has certain eye protection function;
Q:What is the method of installing screen protector for PSP?
Below is the steps of installing screen protector: 1. First, wash your handa and dry them, then ensure there is no dust in the surroundings. If you can't find such environment,then create one-- the bathroom after bathing is a good choice. 2. Then clean the screen spotless with a clean cloth. 3, Rip off the protective film marked with the red label and throw away 4. Make the film which is originally stuck by the red label protective film directed at the screen, and install the screen protector on the screen quickly and accurately. It generally rarely produce bubbles. 5. Tear off the blue tag marked protective film, and it is over. What if the installation of screen protector fail? Never mind, use a scotch tape sticking one ear of the protective film and rip if off the screen, then paste the film another time. If the inside of the screen is stained with dust, you can also use scotch tape to stick the dust, and if it really gets dirty, and can even wash it with water and then dry it.
Q:What geomembrane is used in the dewatering ditch
DMD geomembrane two cloths film one film D non-woven fabrics M PVC plastic film
Q:How to calculate the power consumption of the electric heating film?
In electricity, it is able to reach the normal temperature in the initial half an hour. The heating power is 220W, reaching the set temperature, if 100 square meters of heating area (construction area of about 130 ~ 150 square metre) count laying 59 square meters of electrothermal membrane computing, 220V voltage normal usage rate according to: 102W (using the thermal insulation material case) initial full load power 220W.
Q:The climatic requirements of HDPE geomembrane
1. The temperature should be above five degrees Celsius. Geomembrane should generally be intense under low temperature while under high tempetature it should be loose. 2. The wind is Category 4. 3. In low temperature, Category 4 wind, snowy and rainy days, it cannot be constructed. 4. Weather will affect the construction and welding of geomembrane. HDPE geomembrane should be covered by sand bags.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range