Waterproof HDPE Geomembrane for Landfill to Prevent the Waste Water

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
500000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Waterproof Hdpe Geomembrane for  Landfill:

Geomembrane is a kind of waterproof material with basic raw material of high molecular polymer. It is mainly divided into LDPE geomembrane, HDPE geomembrane,  and all kinds of composite geomembrane.

Main Features of Waterproof Hdpe Geomembrane for  Landfill

  • Complete variety of specifications of width and thickness. Thickness: 0.2-2.0mm.

  • Excellent environmental stress resistant cracking performance.

  • Excellent performance of chemical erosion resistance.

  • Big scope of application temperature and long service life .

  • Low Permeability :HDPE lining systems are secure because leachate does not penetrate them Methane gas will not escape from the HDPE cover system .and rainwater will not infiltrate. 

  •  Chemical Resistance:HDPE ,resistant to a wide range of chemicals ,is not threatened by typical solid or hazardous waste leachates.It is also suitable for sludge and secondary containment  around chemical storage facilities 

  •  Ultraviolet Resistance:HDPE's resistance to UV exposure is further enhanced by the addition of carbon black .Additionally ,with the absence of plasticizers ,volatilization is not a problem .

Waterproof Hdpe Geomembrane for  Landfill Images

 

Waterproof Polyethylene Geomembrane with Colorful for Pond 

Waterproof Polyethylene Geomembrane with Colorful for Pond

 

Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Polyethylene Geomembrane with Colorful for Pond

Waterproof Hdpe Geomembrane for  Landfill Specification :

Thickness

Width

Length

Remark

0.5mm

5.8m ( Standard )

50m - 400m

The standard width is based on the max loading 

quantity according to the container size . 

Its will be loading more quantity to save Freight cost . 

 

 

 

For other types also could be produce as request , 

the exact package will send to you driectly . 

7.0m

50m - 400m

7.5m

50m - 400m

8.0m

50m - 400m

1.0mm

5.8m ( Standard )

50m / 100m / 150m

7.0m

50m / 100m / 150m

7.5m

50m / 100m / 150m

8.0m

50m / 100m / 150m

1.5mm

5.8m ( Standard )

50m / 100m / 140m

7.0m

50m / 100m/ 140m

7.5m

50m / 100m/ 140m

8.0m

50m / 100m/ 140m

2.0mm

5.8m ( Standard )

50m / 100m

7.0m

50m / 100m

7.5n

50m / 100m

8.0m

50m / 100m



FAQ: 

1. How about the delivery time?    

    Two weeks upon receipt of down payment. 

2. What kind of payments do we accepted?   

   T/T, L/C, WesternUnion, MoneyGram. 

3. What's are the MOQ?   

    Normally the MOQ is 5000 SQM in theory. 

    And we can provide you free samples for quality inspection.  

4. Do you charge for the samples?   

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.   

5. Can you produce the product according to customers' requirements?

     Sure, we are professional manufacturer, OEM and ODM are both welcome

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the HS mode of HDPE geomembrane?
1 3920109010 agricultural non-foamed polyethylene thin film, 2 3920109090 other non-foamed ethylene polymer plates, sheets, film, foil and flat strip(non-agricultural).
Q:What is the construction method of the geotechnical membrane?
The construction method: To lay it in the range of measurement. To lay the composite geotechnical membrane before the first required to lay a good sand cushion on the roadbed, laying the width of the design requirements set. When laying, do not allow the laying of folds, as far as possible to tighten. After the pavement, the U type nails or bamboo nails is used to fix. When laying composite geotechnical membrane, the surface of the sand layer is smooth, no hard protrusion, and timely fill sand cover, avoid direct exposure to the sun for a long time. When the composite earthwork film is laid, the length of the transverse lap and the longitudinal lap can meet the design requirements. After the composite geotechnical membrane is rolled out, the filling material is filled up in time, and after the soil is covered with light compaction mechanical compaction, only when the thickness of the overburden layer is larger than 0.6m, the soil can be compacted by heavy compaction machine. Composite geotechnical membrane according to the design requirements can be divided into two types of longitudinal force and lateral force, the laying of composite soil before the film to understand the design intent, strictly according to the design requirements of the laying.
Q:How to tear off the plastic wrap?
There is a serrated knife on the plastic wrap box! Tighten it in the opposite direction. When there is a hole on the saw blade, it will be torn off easily. If you use stripped-down film roller, stroke it with a single-sided blade and it will be torn off easily.
Q:JS waterproof, SBS, SBC, PVC, geomembrane, what are the disadvantages of these waterproof materials?
Geomembrane is not suitable to be in complex pipeline project and constructions. SBS adopts hot melting construction; SBSJS waterproof coating cannot be constructed in below freezing and rainy days, PVC, and the film will need some time to dry, which is not suitable for waterproofing roof. The construction of SBC is complex.
Q:Which application fields is HDPE geomembrane chiefly suitable for?
Environmental sanitation, sewage disposal plant and heap leaching pool: saltern crystallizing pond, settling pond. Polyethylene impermeable membrane is suitable for gardens, plastic straw mat membrane in saltern and impounding pond: 3. salt membrane, vertical core wall: It is suitable for subway, factory farming pools, impounding reservoir and roof garden; 8. High-density polyethylene geomembrane is suitable for petrochemical, twice lining and lining of shrimp pond. 2; 5: Such as refuse landfills, halogen pool cap, afforesting lawn for water and moisture resistance. Polyethylene geomembrane is suitable for mining industry and fishpond: Chemical plants and dissolved pools. Low-density polyethylene film is suitable for transport facilities, sea cucumber circle slope protection, etc. LDPE impermeable membrane is suitable for agriculture, seepage-proofing of ditch, power plant regulating reservoir, green roofs, storage yard, industry, geomembrane solidification, sewage pipe anti-seepage. High density polyethylene impermeable membrane is suitable for salt industry, oil refineries, the pond bottom of golf course: reservoir: 6; 9. It is suitable for the proof seepage of drinking water pond and irrigation system; 10. LDPE impermeable membrane is suitable for water conservancy project and seepage proofing for culvert: Artificial lake, chemical reaction pools, hospital solid wastes, underground constructions of buildings; 4: Intensification, seepage-proof of tailings bottom lining,etc: Such as seepage proofing for rivers, lakes, reservoirs and dams: Washing ponds. HDPE membrane is suitable for the seepage proofing aquaculture industry, ashery, leaking stoppage and oil tank: Road base reinforcement, slope protection, etc.; 7. HDPE impermeable membrane is widely used in municipal engineering, lining of settling pond, revetment, and watercourse. HDPE geomembrane is suitable for environmental protection.
Q:What's the repair method of membrane keyboard?
Membrane repair is a little difficult. First you need to find out where goes wrong. Cut off part of the thin iron wire which is a little longer than that of the damaged circuit, cut off a section of scotch tape, put the iron wire clipped with tweezers on the scotch tape, align the tweezers with the circuit, adhere the circuit to the tape and press, and the problem is solved.
Q:why is the lateral welding edge of composite geo-membrane so dim?
genrally, the four edges of composite geo-membrane produced by factory is left with 10 cm welding edge for the welding of composite geo-membrane. customers can confirm whether the composite geo-membrane is produced by new materials through the left welding edges, the new material is bright and transparent, but the reused edge is dim and yellow. two producing technologies of composite geo-membrane: pressed laminating technology and composite technology. composite geo-membrane's welding edge produced by rolling lamination process is generally smooth and bright, but the composite geo-membrane produced by composite technology is wrinkle and lacks of lights.both two can reach the standards, GB/T17642-2008, composite geo-membrane users can choose the raw materials bby themselves.
Q:What is calculation method of constructional column concrete project quantity ?
The main difference is that you have to consider the concrete volume of stubble for constructional column, while for concrete column you don't have to. 1, calculation formula of concrete volume: Suppose sectional area of concrete column is S1, and height is H1, then the volume V1 = S1 × H1. 2, calculation formula of constructional column volume: Suppose sectional area of constructional column is S2, and height is H2, then the volume V2 = S2 H2 + N × (1/2 × D × K2 ×H2).
Q:composite geo-membrane, two cloths and one membrane geomembrane 6 meters thick material how to use multiple sets of quotas
10 meters dam seepage-proof construction, 1000g composite membrane quotas are not accurate, depth 6 meters, each design Institute are not the same, two cloths one membrane composite membrane 800 grams per square meter is sufficient .
Q:How to stick the film on lampblack machine?
You can just use the preservative film. 1. Pulling the preservative film from its packaging and putting the film on the smoke exhaust hood. Cutting off the film with a blade when the film is stuck to the edge. 2. Pressing and strenghtening the film on the smoke exhaust hood. 3. Sticking the preservative film all over the oil box of the smoke exhaust ventilator. When there is lot of oil, the old film can be repalced by the new one to avoid cleaning the ventilator. Here are some tips. 1. When the preservative film gets dirty, you can just replace it with a new piece. 2. Usually, the film can be changed once a month. 3. In the kitchen, when sticking the film, it is best to pull the film in its package without pulling the membrane core out so that the film can be stuck flat and easily cut off.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range