Tower Crane The Product model -TC4807

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

TC4807

 

TC4807tower crane is a new-style hoisting and transporting machine designed to meet the need of assembling high-level construction equipment. The product is an upper rotary self-lifting kind with horizontal jib, trolley amplitude. The length of the jib is 48m, rated maximum lifting capacity is 4t and rated maximum lifting moment is 400kN.m. The following is the main characteristics.

1. Wide applicability. The applicability is ranging from civil construction in small and medium cities, to high-rise, multi-layered civil construction in big cities. It can also be used in the construction of multi-layered industrial factories, in the slip-form construction of huge chimneys and silos and in goods loading in port or goods yard.

2. Easy to assemble and disassemble.

3. High speed, easy adjustment, stable operation and high efficiency. Low speed with heavy load and high speed with light load can be realized through lifting structure. Two kinds of speed of trolley can meet operational needs. Open stopper is equipped to slewing structure, enabling precise placement and easy assembly of crane. 4. Complete protective and reliable safety devices. The product is equipped with weight limit, moment limit, height limit, trolley limit and slewing limit to ensure normal operation. Besides rest platform, protective railings are also equipped.

5. Driver’s cabin is separately set. It is broad, bright, comfortable, safe and easy to operate.

 TC4807Loading capacity

Jib m

Rate

12

16

18

20

22

24

28

30

34

36

40

42

44

46

48

2t-21.5

2

2

2

2

2

1.75

1.75

1.45

1.33

1.13

1.05

0.91

0.85

0.79

0.74

0.7

4t-11

4

3.93

2.85

2.49

2.2

1.96

1.76

1.44

1.33

1.13

1.04

0.89

0.83

0.78

0.73

0.7

TC4807 Parameter list

TC4807

Max lifting capacity

t

4

Metric lifting moment

400KN.m

Independent

m

29

Attached

m

120

Material of main tower

mm

140×140×12

Section of tower mast

        m

1.5×1.5×2.2

Total power

25.7KVA

voltage

380V50Hz

Hoisting

Type

Fall

Hoisting

Speed(m/min)

Rated power

Rope Length

JZQ460

2Fall

1/2/2

50/33.7/6.5

15/15/4

280m

4Fall

2/4/4

25.5/16.9/3.3

Slewing

XL100

Slewing speed

     Fluid coupling

Torque

0.375/0.75( r/min )

Y0X280A

10000N.m

Trolley

WCJ120

Rated power

Rope Length

Hauling load

2.4/1.5KW

50m

2700N

 

  Mechanism and Factory Photo

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Looking for technical personnel to install, you fuck what heart?.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
Tower crane hoisting hoist how to brake, driving forklift personnel must undergo professional training, through non emergency situations, can not turn sharp and slam the brakes. 3.3.9 in the chute when running on empty 1)
Q:Detailed parameters of QTZ80 tower crane 50
You're welcomeDesign units are different.Our factory is Langfang Design Institute drawings. May refer to the following.Arms 55 meters long.
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:What measures should be taken to make tower cranes stable?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:What is the difference between a jack up tower crane and a fixed tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range