Tower Crane TC7135 ConstructionEquipment Building Machinery For Distributor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 ConstructionEquipment Building Machinery For Distributor

Tower Crane TC7135 ConstructionEquipment Building Machinery For Distributor

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 ConstructionEquipment Building Machinery For Distributor

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical. The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,
Q:What is the difference between a tower crane and a jack up tower crane?
Tower cranes, because there is no running mechanism, so tower crane can not do any movement. Fixed tower crane can be divided into the tower height invariant and Jack up. That is, the jack up tower crane is a kind of fixed tower crane.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(6) the crane of lightning protection and anti electromagnetic wave sensing device shall be equipped with lightning protection device and anti electromagnetic drape induction measures according to the actual situation and shall be equipped with crane with a hinge height of more than 50m at the root of the boom. (7) the tower crane should be installed to prevent the rotary overload limit torque coupling (8) anti off rope device to prevent the wire rope from the working position (9) rope breaking resistant device to prevent car luffing rope break free sliding trolley (10) anti broken shaft device to prevent car car wheel shaft broken after the fall (11) brake parts that is the work device is a safety device
Q:How do tower cranes rise?
Tower crane, or tower crane, commonly known as tower crane, originated in Europe in the early twentieth Century. It has been used for more than one hundred years, and plays an important role in transportation, logistics, construction and other fields. Since tower cranes look like a tower far away, the way they lift up has become a topic of interest. In fact, according to the functions of the crane can be divided into: foundation, tower, lifting, rotating, lifting, balancing arm, lifting arm, lifting trolley, tower, cab, variable part in building tower crane should first install base part. That is to determine the tower crane erection position, determine the principle to maximize the tower crane construction capacity, convenient tower crane entrance and exit and installation, disassembly. Then choose the right foundation type.
Q:What are the parts of a tower crane? What are their main functions?
The tower crane is mainly composed of a tower body, door frame, tower, tower cap, boom, arm and other metal structure and balance hoisting, luffing, slewing mechanism operation, composition and electrical system and safety device etc.!
Q:What is the brand of ZOOMLION tower crane?
How big is the lift? It depends on the size of the motor you use. 24KW motor, the choice is about 100A. 30KW uses 125-150A, 55KW, and 150-180A;Generally 40A contactor is used for turningCar selection of 25A on it.
Q:What is the allowable range of vertical deviation for tower cranes?
The specified installation, construction, demolition of tower crane safety technical regulations in JGJ196--2010: the allowable deviation of verticality Tower: in the wind under no-load, the tower axis line should be less than 4 per thousand of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 2 per thousand. According to the installation state of tower crane, the deviation range of verticality is divided into 4/1000 or 2/1000. Tower crane maximum independent installation height (maximum installation height, does not need to be attached to the wall of the instructions specified in the free end) and height (the highest point of a tower crane attached to the wall above the height, body the following provisions in the specification of tower crane slewing) the vertical deviation range was 4/1000; tower crane attachment verticality deviation below the allowable range is 2/1000.
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range