Tower Crane TC7135 Construction Equipment Sales Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Construction Equipment Sales Building Machinery

Tower Crane TC7135 Construction Equipment Sales Building Machinery

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Construction Equipment Sales Building Machinery

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why does the crane outside my window turn every night when it is not used during the day?
Hi Peter no matter how good he brake on the turn table of the crane is it will be effected by the direction of the wind blowing at any time so it will have some influence on the direction the jib or the crane is in. it will turn just like a weather vane does. it is actually a safety feature.
Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane.9.6.1.2 high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:Could you explain to me what's happening in the first stanza of Stephen Crane's War is Kind?
Yes, Stephen Crane talks about lost love and sacrifices in his poem. The basic casualty of war. A lover, a father and son are lost in his story and those that are left behind he tries to console. The poem is noted for the ironic use of war is kind. We all know that War is really not kind. The poem’s speaker, simultaneously sympathetic with the victims of war and cynical about the purposes of war, implicitly criticizes the image of the romantic hero, showing in graphic scenes the realities of battlefield death and the emotional torment it causes for those left behind.
Q:how to make an simple electromagnetic crane?
Not sure what your question is. Do you know how to make an electromagnet, along with a circuit to turn it on and off? Do you know how to make a crane? It might be easiest to use a fishing pole, and hang an electromagnet off it (with a switch on the handle of the fishing rod). Apart from that, it's hard to know which part of the problem you're having trouble with.
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q:What is the best paper to use for origami cranes for our wedding?
I okorder.com Hope this helps!
Q:Can the tower crane personnel install the construction elevator?
First of all, it is certainly impossible to install the elevator, because the tower and elevator certificate is not the same
Q:anybody know anything about the Crane Fireball Hi 4E ignition?
I don't know how much this is gonna help, but on my Ironhead I use a 8-2100, set at 1degree BTDC, and rear at 2 BTDC and electric start in race mode. Now I have aggressive cams and I don't know how it's supposed to be for a stock single stick.
Q:How do you call that machine that has a small crane inside and u have 2 pick up toys from it?
a claw machine
Q:When you make 1000 cranes, do you have to wish on the spot? Or can you save it until you think of something?
wait, you folded 1999 paper cranes and you still didn't have enough time to come up with a wish? I recommend that you wish to become more decisive...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range