Tower Crane TC7135 Construction Equipment Building Machinery Sale

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Construction Equipment Building Machinery Sale

Tower Crane TC7135 Construction Equipment Building Machinery Sale

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Construction Equipment Building Machinery Sale

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
1, since it is self lifting, as the name suggests, is to rely on their own strength, without other cranes can rise.2, it has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the.3 crane refers to a certain range of vertical lifting and horizontal moving heavy lifting machines. Also called crane. At present the Guangdong SHUNFA hoisting lifting equipment limited company has gradually cancelled lifting driving function. The main features are: the tyre crane driving cab and lifting control room, is be made one crawler crane (crawler crane) evolved, the walking tracks and walking mechanism to support part of the tire chassis, overcome the crawler crane (crane) damage caused by the defects of trackboard pavement, belongs to the material handling machinery. Lifting equipment is characterized by intermittent exercise to do some work, namely the corresponding mechanism, taking in a working cycle of transport and unloading action is the turn of the job, the crane in the market development and the use of more and more widely. Because no leg lifting and lifting driving often appear some accident, driving faster than the crawler crane (crane); stable operation, large lifting capacity, lifting, walking road, but must ensure smooth solid tire pressure to meet the requirements, hanging from the ground not more than 50CM in a certain range is prohibited; with a load of long distance. In order to ensure the safety of operation, the lifting operations are not allowed to be carried out at home.
Q:How do they assemble the cranes that are used to build high rises?
a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.
Q:What do 100 and 1000 different paper cranes mean??!?!?
A Japanese legend indicates that anyone who folds 1000 paper cranes will be granted a wish. Sadako Sasaki was a Japanese girl who died from radiation sickness from the A-bomb dropped on Hiroshima. She wanted to fold 1000 cranes before her death at the age of 12. There is a peace monument to her memory in Hiroshima, and people from all over the world send paper cranes to the site.
Q:Reaction to Sadako and the Thousand Paper Cranes?
This book gave me lots of hope. I really loved to hear about Sadako and how she folded so many cranes. I wanted to believe that she would finish the paper cranes and she would get better. When she died in the ending it was very sad. Someone with so much hope and motivation doesn't deserve to die. The book also made me think a lot about why Sadako was sick in the first place. She was only two-years-old when the Americans dropped the bomb on Hiroshima, but she was still eventually killed from it. This book shows the long-lasting effects war has on a country and its people. It really makes you think twice about war. I really enjoyed reading this book. It was an easy read that I had a hard time putting down. Every chance I got I read this book! While it was sad in the end, it was great to hear about Sadako's life and how her friends finished her paper cranes for her. The plot was interesting and exciting. I really like the main character too. Sadako was a very brave, strong person that I wish I was more like. She woke up every day with the will to live and that gave me a lot of hope.
Q:Why does Crane deliberately place the dinghy's crew in sight of land in the story?
The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
Q:Who is Seneca Crane in The Hunger Games?
The Games maker for the 74th Hunger Games.
Q:What are the conditions of tower cranes, strictly prohibited?
A. Products obsolete by the stateB, over the specified service life, failed to assess the quality of the productC, products that do not conform to national or trade standardsD, products without complete security technical records
Q:how do they erect cranes? has anyone seen one go up?
I okorder.com you may find an article mate
Q:How to build a strong paper crane?
Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa.gov/wisha/rules/generalsafety/images/24_d2_a-frame.gif
Q:what is crane rigging?
Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range