Tower Crane TC5613 QTZ80 Base Section New

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.3T
Span: 56M Rated Load Moment: 80T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5613(QTZ80) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5613

 

Free standing height (m)

46

Max height with attachment (m)

150200

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 56mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

14.1

Mast section sizeL×W×Hm

1.8×1.8×2.5

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

Loading diagram

 

56m jib length

R

2.5—13.7

14

20

24.9

26

32

35

38

44

50

56

a=2

4t—24.9m

3.80

2.94

2.63

2.36

1.94

1.63

1.38

a=4

8t—13.7m

7.79

4.12

3.92

3.72

2.86

2.55

2.28

1.86

1.55

1.30

 

50m jib length

R

2.5—15.1

16

22

26

27.6

32

35

38

42

50

a=2

4t---27.6m

3.34

2.99

2.70

2.37

1.88

a=4

8t-15.1m

7.48

5.15

4.22

3.92

3.26

2.91

2.62

2.29

1.80

 

44m jib length

R

2.5—16.3

20.9

26

29.8

32

35

38

40

42

44

a=2

4t---29.8m

3.69

3.31

2.99

2.79

2.63

2.48

a=4

8t---16.3m

6.0

4.64

3.93

3.61

3.23

2.91

2.72

2.55

2.40

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
the requirement for selecting the steel quality group based on the results of brittle fracture evaluation of steel is increased;Environmental requirements and nondestructive testing requirements for welds are increased;- increased the number of institutional requirements;- increased the type and requirements of some of the units;- - increased technical data requirements that manufacturers should provide;- added some information labeling requirements;- mounting and climbing requirements are increased;The inspection requirements of tower crane are described in detail.
Q:Emergency treatment of interrupted electricity during lifting of tower crane
The rotating gear shall be immediately inserted into the screw or wood, while the power supply shall be checked rapidly to remove the trouble.
Q:How often should the crane be inspected regularly?
Crane safety supervision regulations twenty-fourth in lifting machinery safety regular supervision and inspection cycle for two years, elevator and manned elevator safety regular supervision, inspection cycle for a year.Eighteenth lifting machines should check the lifting machines regularly, including annual inspection, monthly inspection and daily inspection:I. at least one full inspection shall be carried out annually on the lifting machinery used.The load test can be carried out by lifting the heavy load which is equivalent to the lifting weight, and checking the safety performance of the mechanism such as lifting, running, turning and amplitude according to the rated speed.Lifting machines which have not been used for more than one year should be examined comprehensively before use.Crane in case of four or more earthquakes or major equipment accidents, outdoor work crane after more than nine winds, should be used before a comprehensive inspection.
Q:What are the conditions of tower cranes, strictly prohibited?
A. Products obsolete by the stateB, over the specified service life, failed to assess the quality of the productC, products that do not conform to national or trade standardsD, products without complete security technical records
Q:How to fix the cable on the tower of QTZ125 type tower crane?
let the main cable and metal member completely separated, safety code for tower crane and tower crane installation, use and dismantling specification is not clear and specific practices, according to my experience, in accordance with the methods mentioned before can do check, usually meet the requirements.
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:What are the parts of a tower crane? What are their main functions?
Jacking frame: placing slewing mechanism, when lifting tower top, bearing the weight of tower crane balance arm, main arm and tower cap.Standard section: support the weight of tower crane itself and lift the weight of heavy load, and resist the overturning moment of tower crane.Institutions include the followingLifting mechanism: lifting heavy objects.Luffing mechanism: lifting the car to change the rotation center distance.: the upper part of the slewing mechanism of tower crane (including the main arm and balance arm and tower cap) around the rotation center of rotation.Lifting mechanism: tower crane lifting, the upper part of the tower crane elevated hydraulic power system.Walking mechanism: the crane can walk on the track.OtherDrivers’ RoomElectric boxLinkage tableA foundation bearing platform or trackOther safety devices
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range