• Tower Crane TC5516 type new distributor find System 1
  • Tower Crane TC5516 type new distributor find System 2
  • Tower Crane TC5516 type new distributor find System 3
  • Tower Crane TC5516 type new distributor find System 4
  • Tower Crane TC5516 type new distributor find System 5
  • Tower Crane TC5516 type new distributor find System 6
Tower Crane TC5516 type new distributor find

Tower Crane TC5516 type new distributor find

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details


Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 55m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC5516         

 

Packaging & Delivery


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications


● Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.


● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability.


● Reduce future maintenance cost.




FAQ

 

Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 


To Lead The Revoluation of International Trade

Q:Can the attached arm of the tower crane be welded?
The calculation of the attachment of tower crane mainly includes three parts: attachment rod calculation, connection calculation of attached bearing and calculation of attached frame. (1) the attachment bar calculates the attachment bar and is calculated by the compression member of the pivot shaft hinged at both ends. 1) the internal forces of the attached rod and the internal force of the connecting rod are taken as required by the instruction; if the specification does not specify, or when the spacing between the two supports connected with the building is changed, the calculation shall be carried out.
Q:does it only carry thousand of pounds stuff or wat?? for science project??
Cranes are large, long-legged and long-necked birds of the order Gruiformes, and family Gruidae. While folklore often states that cranes mate for life, recent scientific research indicates that these birds do change mates over the course of their (considerable) lifetimes (Hayes 2005). Some species and/or populations of cranes migrate over long distances, while some do not migrate at all. Cranes are gregarious, forming large flocks where their numbers are sufficient.
Q:First Summary gets best answer...thanks!
The City is covering itself by shifting the blame form a negligent city inspector to the crane company by charging its owner with Manslaughter Charges. This is typical of civil service personal who forget who they work for (We the People).
Q:Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
Of course cranes have pulleys. If you know how they work it should be clear. Why else do you think there are two, or more (depending on the crane), ropes attached to their hook. Every rope added, except for the first, halves the weight of the object you want to lift. If you have two ropes and an object is 5 tones, the crane will only need the power to lift 2,5 tonnes. If it has six ropes it even only need the power to lift one tonne. And an axe is a wedge, logically. In fact, every tool with a blade is more or less a wedge. After all the wedge is the principal of a blade's function.
Q:I want to know what the cheapest way is to rent a crane. I want to crane a spa out of one backyard to another. Where can I go to find a great deal on a crane rental?
call a crane rental company - rates are pretty standard in the industry for each type of equipment
Q:I've heard of people making 1000 origami cranes as a wedding gift or decoration. I am making them as a gift for my sister-in-law and her husband, whose new baby is due next month. I'm up to 730, so I need to keep plugging away! My question is how should I display them? I've heard of putting them in a gallon jar. I was also thinking of making strings of 100. Do you put the string through the pointy part on the back? Can I arrange them into a mobile? Any ideas would be appreciated.
it relatively is like asking: once you're making a wish on a taking pictures megastar, will it come real? even although the two are extreme-high quality gestures, no it won't come real. Origami cranes are purely products of paper that are folded to resemble birds; no rely what number you're making, they won't address supernatural expertise inclusive of wish-granting.
Q:What do you do to become a crane operator, do you go to school and how long is it?
OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:the lenght of beam is 4.5mmaterial of beam is ASTM Gr60
difficult question
Q:Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
well I'm not sure but need to over estimate for safety cause there are all ways mitigating forces @ play when using cranes be safe first dude you dint want to be sued for being cheap and if yo do good work word will get around

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords