Tower Crane 10 Ton TC6024 2000*2000*3000MM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 2.4M
Span: 60M Rated Load Moment: 160T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6024(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC6024

 

Free standing   height (m)

50.5

Max height   with attachment (m)

200

Working range   can be adjustedm

485460

Min working   rangem

2.5

Max lifting   capacityt

10

Tip load @ 60mt

2.4

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweight  (t)

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

63

Power supply   requirement (KVA)

230KVA for   generator

Cable type (   within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V      219A

Rated working   voltage & current

380V                 121A










Loading diagram

 

60m jib length

R

2.5-15.85

20

32

36

40

44

50

56

60

a=2 (kg)

5000

(2.5-31.25

4874

4291

3821

3436

2971

2604

2400

a=4 (kg)

10000

7897

4804

4221

3751

3366

2901

2534

2330

 

54m jib length

R

2.5-16.25

20

30

34

36

40

44

48

50

54

a=2 (kg)

5000

(2.5-32m

4687

4405

3925

3530

3200

3054

2795

a=4 (kg)

10000

8099

5289

4617

4335

3855

3460

3130

2984

2725

 

48m jib length

R

2.5-35

39

45

48

a=2 (kg)

5000

4490

3790

3500


2.5-19

30




a=4 (kg)

10000

7890

4385

3685

3395


Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory

 

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline. The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:What Japanese counter word is used for multiple origami objects...such as 1000 cranes?
1,000 cranes is counted using the bird counter (there's one specifically for birds or rabbits) so it's sen-ba-tsuru. It would depend on what you've made in origami. The most general counter would probably be -ko. one origami work ikko two niko three sanko four yonko five goko six rokko seven nanako eight hakko nine kyuuko ten jikko I think you could use it for almost anything that you could make in origami, though, (like senbatsuru) there could be a more specific counter to use depending on what you made, but there are so many counter words. If it's something flat, or you wanted to count origami paper, then it's -mai If it's a long slender work of origami -hon
Q:what dose fury mean and craned?
Q:what is the function of load indicator on a crane?
Two things, The maximum lift and the maximum extension of the boom. The maximum lift is based on weight and structural considerations and the maximum extension of the boom prevents the crane from turning over. The weights on the back of the crane is prevent the crane from turning over. TexMav
Q:In what circumstances should a tower crane be demonstrated by an expert?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsBuilding quality [2009]87 number]Annex twoMore than a certain size of the risk of larger sub sub project scopeI. deep foundation pit engineering......
Q:Gantry Crane?
This okorder.com/
Q:What happened to the paper cranes Sadako made?
I'm glad somebody remembers Sadako. But yo, i don't know.
Q:Does anyone have a picture of Seneca Crane being walked to his death by two peacekeepers in The Hunger Games?
I don't think it would be out there yet, as the movie just came out. I would try searching Seneca Crane and then your dad's name. You also might be able to find it on YouTube. It's really cool that your dad was in the movie!! Good luck finding the picture!
Q:Where would i be able to find a timeline about the book The Red Badge of Courage by Stephen Crane?
Q:I need help on finding the least amount of steps on how to make an oragami crane.?
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range