topless tower crane with competitive price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, QTZ125 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5to 60m, QTZ125 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of our tower crane:

 

topless tower crane with competitive price

topless tower crane with competitive price

topless tower crane with competitive price

topless tower crane with competitive price

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:How do tower cranes rise?
Tower crane, or tower crane, commonly known as tower crane, originated in Europe in the early twentieth Century. It has been used for more than one hundred years, and plays an important role in transportation, logistics, construction and other fields. Since tower cranes look like a tower far away, the way they lift up has become a topic of interest. In fact, according to the functions of the crane can be divided into: foundation, tower, lifting, rotating, lifting, balancing arm, lifting arm, lifting trolley, tower, cab, variable part in building tower crane should first install base part. That is to determine the tower crane erection position, determine the principle to maximize the tower crane construction capacity, convenient tower crane entrance and exit and installation, disassembly. Then choose the right foundation type.
Q:Tower crane railing height is greater than or equal to meters
GB 6067 requires the height of the railings of the crane to be 1050mm, and a horizontal bar with a spacing of 350mm shall be provided. The bottom should be set at a height of not less than 70mm.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
This really did not hear, the site installed to be tested, usually installed, in accordance with the safety procedures, acceptance of the OK
Q:Can the tower crane personnel install the construction elevator?
Although it belongs to the construction of special operations, but the operation of different categories, tower crane demolition workers according to the requirements can not install the elevator!
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:What does a track type tower crane look like? In that case, use?
The rail type multi characteristic tower crane consists of track, door frame, main arm, auxiliary arm, hook and so on. Its features are: A, crane through the door frame (2), supported on a track (1); B, the door frame (2) is provided with a rotary bearing (3); C (3) is arranged on the rotary supporting all kinds of machinery and equipment (4), and balance weight (8); D, the main arm (5) the jib (6) through the bearing cable (7) is installed on the rotary support (3); E, the main arm (5) side arm (6) and Russo (7) can have a variety of length combination; F, a main arm, jib all tube truss structure; G, hook pulley h, equipped with a variety of rate; the torque limiter (10) and amplitude detection device (11); I, operating room in slewing bearing (3); J, self moving use winch is luffing winch main arm, mounted on a rotary support (3).Track type multi characteristic tower crane. The utility model is especially suitable for power construction and hoisting operation. The slewing support on the track type door frame is provided with a main and an auxiliary arm frame, and various variants can be formed through different combinations. Its maximum torque of 3360 tons meters, the maximum lifting capacity of 140 tons, the maximum working range of 60 meters, the maximum rise of 120 meters. The utility model can be carried in the lifting, and the work is smooth and safe. The main and auxiliary arms are all truss structures, light in weight. The electronic torque limiter and other safety devices are adopted, and the 130 meter high machine can be installed by itself. This machine can also be used in petroleum, chemical, metallurgical and other large projects.
Q:What does "jack up" tower crane 1000KNm mean?
1000KNm means the lifting moment. Equal to the maximum lifting capacity of 63 tons.
Q:What is the free height of a tower crane?
The free height of tower crane is different according to the size of tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range