TCT5012 (6T) Topless Tower Crane From CNBM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6 Maximum Lifting Height(M): 200m Rated Loading Capacity: 6
Span: 70 Rated Load Moment: 70

Product Description:

Product Description:

The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.

Main Product Features:

1.       Widened equipment capacity and working scope.

2.       Suitable for the groups of tower cross framework.

3.       Noise relief stability with and combination amplitude range.

4.       Can sustain height adjustment for occasional exceptional height construction procedures.

5.       Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

LoadingPort:

Chinamain port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

 

 

 Product Images:

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

tower crane Specifiction

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:What are the characteristics of a tower crane?
Four, according to the different installation methods of cranes, can be divided into folding transport, self erection of the rapid erection of tower cranes and the need to use the auxiliary machine assembly and disassembly of tower cranes.Can set up their own fast loading crane are small and medium slewing tower crane, mainly used for short duration, low buildings move frequently, the main advantage is to improve work efficiency, save installation cost, save time and labor and material, disadvantage is the complicated structure, large amount of maintenance.A tower crane that needs to be disassembled and assembled by an auxiliary machine is mainly used in middle and high rise buildings, with large working range and large lifting capacity. It is the main type of construction site at present.Five, according to whether the spire structure, can be divided into flat head tower crane and tower tower crane.Tower crane is a new type of tower crane is developed in recent years, its characteristic is the tower cap and the rod part before and after the cancellation in the structure of the original tower crane on the enhanced structural strength of the arm and balance arm, arm and balance arm is directly connected, the utility model has the advantages of:1 、 the whole machine is small in size, easy to install and safe, reduce transportation and storage costs;2, the boom of tolerance and good performance, uniform stress, small damage on the structure and connection part;3, component design can be standardized, modular and interchangeable, reduce equipment idle, improve investment efficiency.It is in the same type of tower crane tower crane head Zhongping slightly higher prices.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q:How often should the crane be inspected regularly?
Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
It must be installed:To prevent the trolley cable broken car slip away;
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
Lifting moment, arm length, elevation is not the same ah! Specifically, the maximum lifting weight of QTZ315 is 3 tons, the length of the arm is from 38-42 meters, the elevation is 27-28 meters; the maximum QTZ40 is 4 tons;
Q:Tower crane driver simulation exam which website?
The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:What is the function of the balance valve in the hydraulic jacking system of tower crane?
The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range