• TCP6022 Topless Tower Crane System 1
  • TCP6022 Topless Tower Crane System 2
  • TCP6022 Topless Tower Crane System 3
TCP6022 Topless Tower Crane

TCP6022 Topless Tower Crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

·    Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.

·   Manufacturing Year: 2014

·  Jib Length: 60m

·   Free Height Under Hook: 50.7m

·  Max. Load: 10T

·  Tip load: 2.2T

·   Mast Section Dimension(m): 2x2x3(L66)

· Hoisting Speed(m/min) & power: 0~85 45Kw frequency

·    Slewing Speed (r/min) & power: 0~0.8 2x5.5Kw frequency

·   Trolleying Speed (m/min) & power: 0~58 7.5kw frequency

·  Cable specification: 3x25+2x16

·  Power Supply: 400V(+6% -10%)50HZ

Q:I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
Q:how do you say paper crane in japanese?
Japanese Word For Crane
Q:I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:where did the story originated from? how and why did it happened?
It's okorder /-- The fable that babies are brought by storks is from Ger. and Du. nursery stories, no doubt from the notion that storks nesting on one's roof meant good luck, often in the form of family happiness. Online Etymology Dictionary, 2001 Douglas Harper
Q:I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
The okorder
Q:The arm of a crane at a construction site is 12.1 m long, and it makes an angle of 30° with the horizontal. Assume that the maximum load the crane can handle is limited by the amount of torque the load produces at the base of the arm. (a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N?(b) What is the maximum load for this crane at an angle of 35° with the horizontal?
(a) What is the magnitude of the maximum torque the crane can withstand if the maximum load the crane can handle is 500 N? τ = FL τ = 500(12.1cos30) τ = 5239.45 τ = 5240 Ν?m (b) What is the maximum load for this crane at an angle of 35° with the horizontal? τ = FL F = τ / L F = 5239.45 / 12.1cos35 F = 528.6109... F = 529 N I hope this helped. Please remember to vote a Best Answer from among your results. It's good karma as it keeps things in balanced exchange.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:when a tall building is under construction you alwase see cranes on top. well i would like to know 1. how they move them up as the buildung gets taller and 2nd after there done how do they get them down?
bigger cranes
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
In fact, in the long run, in a word, what the construction site is finally all party a pay, just clearing the count.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords