• TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate System 1
  • TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate System 2
  • TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate System 3
TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CE ISO Certificated Tower Crane (TC6024 Topless/Top-kit/Flat-top 10T)

 

Product Description:

TC6024 has competitive prices and excellent quality is also suitable for all kinds of construction project and can work under variety of work condition. With their working radius from 2.5 - 60m, TC6024 tower cranes are famous for their large operating ranges, varied working methods and wide usage. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechinism and a hydraulic self-raising mechanism. It’s original in design, reliable in operation and satisfactory in shape.Equipped with all necessary safety devices, these cranes show excellent speed-control capacity, satisfactory operation stability and high work efficiency. They are also widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings such as tall chimneys. Top quality after sales service will be offered guaranteeing your satisfaction with our products.

 

Product Features:

·         Widened equipment capacity and working scope.

·         Suitable for the groups of tower cross framework.

·         Noise relief stability with and combination amplitude range.

·         Can sustain height adjustment for occasional exceptional height construction procedures.

·         Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

Loading Port:

China main port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

Product Images:

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

Tower crane Specifiction TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

TC6024 Topless/Topkit/Flat-top 10T Tower Crane with CE ISO Certificate

FAQ:

Q1: What is shipment procedure?

A1: You can put two sets of wheel loaders in one 40HQ container. The spare parts are packed with boxes. Also can be delivery within 20 days.

 

Q2: How is your service?

A2: With our company we hold our client’s needs as top property. We have first rate professional technology and provide excellent after-sales services.

 

Q3: What is your after sales service?

A3: We provide Preventative Maintenance and After Sales Service. We strongly feel the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer a one year warranty to our customers. .

Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
I know there are 5 styles of kung fu Is that what you know? The 5 Animal are sets that are included in various arts. And the ones you mentioned are wrong. Crane is not used for Balance. You got this from some TV program with the crane guy dodging ninja stars while balancing on Mei Hua poles. Those people were showing how little they understand martial arts and the crane guy was representing Tibetan Crane. He must have been bursting from wanting to show the true essence of Tibetan Crane but couldn't because the show dictates what they want to showcase. Either way, don't go by your own understanding because you don't know the real essence of these styles. Go online and research for yourself, from reputable sources. I can point you to some if you're really interested in TRUTH in the martial arts and not BS. Don't say things like I know that... because you don't. Learn about it for real.
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:My fiance and I would like to make 1,000 paper cranes for our wedding next year in May. We are looking for a good type of paper to use for this. We are not too particular on the color of the cranes, though we like blue or gold. Does anyone have any feedback on the sort of paper I can get for this project? I know there is origami paper I can buy, but I was wondering if that is the only option I have to choose from. Thanks in advance! :)
I okorder Hope this helps!
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:in design of steel structures as per asce2005 or ibc2006 ,what load combinations are to be considered when crane loads and seismic loads are present?
Uh, depends on if you're using ASD or LRFD load cases out of ASCE 7-05. I also think IBC 2006 sometimes changes the fine print and also offers their own load cases for ASD and LRFD. A starting point (LRFD case 5 ASCE 7-05) might be 1.2D+1.0E+ L, and for ASD - case 6 - D + 0.75(0.7E) + 0.75L.
Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:Only two magnification and four magnification are seen in the data, and the difference in weight is 0.1T. 10How does this magnification change during construction? Do you know that the door crane is changing the grab tower?
Magnification, in simple terms, refers to several ropes through the hookIf it is one in and out of two wire rope, that is two magnificationSimilarly, two into two out is four magnification
Q:i have an echo-1 m8a4 cqb it has a crane stock that fits a 9.6 1500mah battery but it wont fit a 2000mah so i want to switch to a full stock but im haveing trouble figuring out how to switch them. does anyone own this gun and know how to do it?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q:how to make an simple electromagnetic crane?
STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords