Stayed-cable Cantilever Traveller in Good Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

STAYED-CABLE CANTILEVER TRAVELLER

Stayed-cable cantilever traveller is applicable to large-scale stay-cable
cantilever casting bridge with wide bridge deck, heavy and long segment. Most of
the componants concentrates on bottom frame and walking system. It has no main
frame, at the same time, the lift is done by the stay-cable of the bridge. Comparing
with other types, the sigle weight of stayed-cable cantilever traveller is heavier.

●Low gravity of front trancerse beam

●Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

●Safe & easy operation, easy fixing, and safty during walking

●Big operational space under the main frame, and easy installation and removal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Want to form a group of single women travelers in Pune, anybody interested?
i think , you should use orkut or facebook, and try your luck
Q:Hanging basket in the construction of the 2 block construction is also need to press it
4 anchor bolts to be tightened by means of jack.5 the outer side of the mold at the anchor plate do not pack dead.6 when you walk in the basket, be sure to move smoothly.7 cantilever pouring concrete should be from the basket to the front of the basket to the end of the basket
Q:Is hanging basket equipment special equipment? Need to record it?
After the completion of the installation of special equipment, construction safety supervision station shall apply for registration procedures
Q:Construction technology of bridge hanging basket
D, the crane will be used to bridge the bottom of the bottom of the platform to lift the platform, and with the front sling, and then install the rear sling;D, installing the rear cross member and rear outer belt;E, to the basket to pre pressure to eliminate the plastic deformation, determine the size of elastic deformationF, the installation of internal and external model walking beam and to the 1# position;
Q:Hanging basket construction contract unit price
Give you a reference price:Project unit priceCantilever concrete m3 535Cantilever beam reinforcement t 580Steel strand blanking, install t 500
Q:Construction of hanging basket. Pouring concrete and new concrete, how to achieve good adhesion
In order to achieve a good bond between old and new concrete, it is necessary to pay attention to the construction of hanging basket:(1) the pouring of concrete must be pushed forward by the front end of the hanging basket to prevent the concrete crack caused by the deformation of the concrete.
Q:After the completion of prestressed tension grouting on the basket can move forward
[] the hanging basket is a walk along the railway activities scaffolding, hanging basket hanging in the already stretching and anchoring box girder, cantilever casting box girder formwork installation, rebar, pipe installation, concrete pouring, tensioning and grouting work were carried out in the hanging basket. When the construction procedure of a beam section is completed, the hanging basket is lifted, and the beam is moved downwards. Therefore, the hanging basket is not only the space of the construction equipment, but also prestressed tendons before the beam segment of the load-bearing structure, and now large, medium and large buildings use this equipment.
Q:What are the key processes of hanging basket construction
5, construction of prestressed beam shape control; 6, 7; and the closure above and the construction of system transformation are met according to arrangement of students problems in practical work and, for reference, if there is a problem, please timely communication.
Q:The definition of hanging basket construction, historical background
With the development of material science and computer science, a lot of cable-stayed bridges have been built at home and abroad since the Stromsun bridge in 1956 started the apex of modern cable-stayed bridge. The cable-stayed bridge has been developed rapidly because of its advantages such as large span, good structural performance, simple construction, easy maintenance, low cost and attractive appearance.
Q:How to define the construction stage of continuous beam bridge hanging basket construction
Continuous beam Shujing indeterminate structure, can solve the internal force of law

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range