• Applicable to Large-scale Rhombic Form Traveller System 1
  • Applicable to Large-scale Rhombic Form Traveller System 2
Applicable to Large-scale Rhombic Form Traveller

Applicable to Large-scale Rhombic Form Traveller

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

RHOMBIC FORM TRAVELLER

The rhombic form traveller has the advantages of simple structure, clear
stress, big operational space under the main frame, and easy installation
and removal, etc..
The form traveller adopts wheels with bearing while rolling forward which
reduce the frictional resistance greatly during movement; At the same
time, the stainless steel paltes are welded on the rails which reduced
the frictional resistance bewwen the sliding bearing and the rails during
movement. The combination of these reduce the movement cycle of the
form traveler by simple and convinient operation.
In terms of safety, the form traveler is equiped with walking protection
system which guarantee the absolute safety during working. It’s safe, easy
and practical.

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Q:The construction of the hanging basket of the bridge needs to be pre - pressed in each suspension section
The main equipment of cantilever pouring is a pair of walking hanging baskets
Q:Hanging basket construction steel binding labor costs a ton of money
Two provide semi-finished steel transport B from the steel processing field will be processed to cantilever at
Q:I would like to know that each piece of the construction of the hanging basket is connected by way of the whole as a whole, I always think of each section is a section of tension.As you said, the steel strand is the length of the whole beam, but how to form the whole concrete?
Pour the mud into the joint! Elephant building interface!!! Have to reinforce!! Reinforcing bar! That's it.
Q:Seven techniques of hanging basket
10.5. tube. When the concrete is vibrated, we should pay attention to avoid the bellows to prevent the vibration rod from leaking;10.6. to nap. Because of concrete pouring, the surface still paving asphalt concrete, in order to enhance the bonding between the deck and asphalt layer layer of political government must firmly on the concrete surface roughening treatment:10.7. maintenance. After the concrete pouring, maintenance to improve the strength of concrete and prevent the formation of fine cracks, has an important role. Therefore, water conservation should not be less than seven days.
Q:Hanging basket assembly quality control point
The composition of the basketHanging basket bearing system, bottom formwork system, side formwork system (inside and outside), walking system, rear anchorage system. A hanging basket is made up of two triangles, each of which bears the weight of the beam. Taking into account the processing capacity of the construction site, the main beam, the sliding beam, the upper beam and so did not use a reasonable truss structure, and the use of steel structure.
Q:Hanging basket construction must be both sides at the same time construction? Are there any rules? What is the norm?
Hanging basket is hanging on the structure of the tool type scaffolding, its movement by crane or tower crane
Q:Cantilever pouring construction should pay attention to what
Prestressed concrete continuous beam bridge, continuous rigid frame bridge span and span rivers, valleys, so the main use of cantilever pouring construction. Cantilever pouring method refers to the construction of the bridge on both sides of the working platform, a balanced section to the middle of the cantilever pouring cement concrete beam, and the construction of the application of prestressing. The main equipment is a pair of walking hanging basket, pull anchor in Zhang and pier has connected mobile beam on the whole hanging basket, and binding steel formwork, pouring concrete, prestress are carried out on the. After the completion of the construction of this section, the hanging basket symmetrical move forward a section, the next pair of beam section construction, in advance, until the cantilever beam section pouring completed.
Q:The hanging basket is the main equipment of the cantilever pouring construction of the bridge
Hanging basket is the main equipment of cantilever pouring construction of bridge,
Q:Construction scheme of hanging basket
Each pier is equipped with 23 cantilever sections: 5*2.5m + 5*3.0m + 5*3.5m + 8*4.0m. Beam length of 4.0m, maximum weight 156 tons. The cross section of the box girder: the width of the top plate is 15.42m, the width of the web is 7.5m, and the height of the beam is changed from 0 8.8m to the 3.0m of the block 23 according to the two parabola.
Q:I would like to ask you how to sort the hanging basket? What is the front fulcrum hanging basket
3, hanging basket construction;4, concrete pouring construction;5, prestressed construction;6, beam body linear control;7, closure section construction and system conversion

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords