Custom High Security H20 Timber Beam Formwork for Straight Concrete Wall

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of H20 Timber Beam Formwork for Straight Concrete Wall

 

TBW system-A is a kind of formwork for pouring straight wall, it is composed of several pieces of Tim-formwork, yoke, tie rod, wing nut, etc.

It will be designed according to wall’s size.

 

2. Main Features of H20 Timber Beam Formwork for Straight Concrete Wall

1. Prefabricated connection, convenient and efficient.

2. Light weight but high bearing capacity.For conventional design, its load bearing capacity is 60KN/m2 with weight of 55-60kg/m2. If required, the formwork can be specially designed for higher concrete pressures.

3. Timber is easy re-sized, so the Tim-formwork is relatively easier to change self’s size and shape. This approved formwork’s economical efficiency.

 

3. H20 Timber Beam Formwork for Straight Concrete Wall Images

 

 

4. H20 Timber Beam Formwork for Straight Concrete Wall Specification

Custom High Security H20 Timber Beam Formwork for Straight Concrete Wall

 

 

5. FAQ of H20 Timber Beam Formwork for Straight Concrete Wall

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in H20 Timber Beam Formwork for Straight Concrete Wall, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of H20 Timber Beam Formwork for Straight Concrete Wall, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Beam plate template is composed of the bottom template and what
The template will be installed to expand into one piece, each piece of the area is Si=F*A*B, the formula, F coefficient
Q:Calculate the beam template when you want to reduce the thickness of the plate
Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.
Q:How to determine the height of cast in place concrete beam formwork
4.4.6 on the span of not less than 4m of the beam, the plate, the height of the template arch should be the beam, plate span 1/1000~3/1000.
Q:Cast in situ floor and girder formwork can be removed a few days?
When the bottom formwork of the reinforced concrete slab with a span of 5m is removed, the concrete strength should be greater than or equal to 75% of the standard value of concrete cube compressive strength.
Q:Seeking beam, plate template engineering quantity
Main girder template (bottom area +2* side area): (2.4*3- wall thickness) * (0.25+ (0.4-0.12) *2) *2--0.25*0.4*2*4 secondary beam area
Q:What is the wire mesh in front of the foundation beam
Beams are reinforced, how to put into the template? How can we ensure that the concrete does not flow out? Wire netting is the best way
Q:What is the formula of beam slab formwork
Rectangle, F=1, A is the length of the bottom edge, B is high.....So, S1S2, S3,..., one by one.The sum of the above Si is the total area. The amount of template engineering is required.
Q:What are the main composition of the beam template
D> suspended beam formwork support composite structure A> roof formwork support composite structure consists of main beam (main dragon's back), auxiliary beam (vice dragon), support rod, cross bar composed of B> shear wall formwork supporting structure.
Q:How to control the elevation of the beam bottom and the axis position
The axis is controlled by hanging the ball down to the lower floor axis and the axis control line.
Q:What kind of frame beam formwork
Frame beam template, single beam, continuous beam template section, beam set beam template in the middle section.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range