SJ TOWER CRANE QTZ80(TC6010)

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower crane TC6010 description

TC6010 tower crane is our company according to the design of tower crane"GB/T5031-2008" model of the tower crane.

1) work much, wide range of use, this machine has a fixed base and wall attachment type.

2) has high working speed, good performance of speed regulation, stable operation, high efficiency. Three speed motor and single speed ratio reducerused in lifting structure, so that the heavy load and low speed, light load speed.

3) crane configuration lifting height limiter, moment limiter, amplitude limiter,lifting weight limiter, slewing limiter, rotary, traction mechanism brake safety device, and trolley rope breaking resistant, anti broken shaft device, themachine is suitable for various different construction environment, ensure thework reliability of tower crane.

4) cab uses linkage Taiwan advanced operation of the mechanism of action of easy operation, simple repair.

Tower crane TC6010 technical parameters

The maximum working range of 60m, end weight and the maximum take-off weight of 6T 1T.

Mechanism is equipped with three speed motor hoisting, smooth brakingimpact is small when shifting.

Luffing mechanism can provide two kinds of speed.

Free standing height 44.5 (M)

The maximum height of 200 (M)

The working range of the tunable 43/49/55/60 (M)

The minimum working range of 3 (M)

The maximum lifting capacity of 6 (T)

End load "(T) 1 (M)


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can you make a camera look up, down, left, right, etc on a crane?
On a real camera crane you would press the up and down button that moves the wrist part of it. ( I drove a forklift). If you are doing to yourself you'll have to rely on the elbow movements. I might think about renting a Genie lift. And letting someone be your hands in the thing. Unless you know how to build a fully articulating hydraulic ball-joint?
Q:what is so ironic about the open boat by stephen crane?
Knowledge the dynamics of any social situation and to be able to bend and manipulate the problem for your own conclusion use is a thing that you dream on the you may be in total get a grip on of any situation using Black Ops Hypnosis
Q:Is the boom of a moveable crane a lever?
No. A lever requires a fulcrum and a boom has none. As ststed the levers are used to operate the hoisting mechanism.
Q:What is cost of 2000 ft of crane runways?
Preformed okorder.com/ We Build Cranes To Meet Your Needs And Your Budget. Free Quote. Offers a free quote. click link .
Q:when do i start bernie cranes missions gta 4?
You have to have progress enough to be in Algonquin (the second island) and yo have to complete the Hostile Negotiation and No Way on the Subway missions before you encounter Bernie and are able to take mission from him.
Q:Is there a crane big enough to lift Hillary off the yoga matt when she has finished her yoga?
Unfortunatly....
Q:how do they erect cranes? has anyone seen one go up?
If okorder.com/.. Crawler cranes/ have tracks like a bulldozer/ normally have a larger lifting capacity and are brought to the work site on multiple semi-trucks. Then put together with smaller cranes. Hope this answers most of your questions. Wingman
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:airsoft m4 full stock, to crane stock?
M4 Crane Stock
Q:Fujian White Crane Kung Fu?
white okorder.com/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range